Removal and replacement procedures 29
WARNING:
To reduce the risk of personal injury or damage to the equipment, be sure that:
•
The leveling jacks are extended to the floor.
•
The full weight of the rack rests on the leveling jacks.
•
The stabilizing feet are attached to the rack if it is a single-rack installation.
•
The racks are coupled together in multiple-rack installations.
•
Only one component is extended at a time. A rack may become unstable if more than one
component is extended for any reason.
WARNING:
To reduce the risk of personal injury or equipment damage when unloading a
rack:
•
At least two people are needed to safely unload the rack from the pallet. An empty 42U rack
can weigh as much as 115 kg (253 lb), can stand more than 2.1 m (7 ft) tall, and might
become unstable when being moved on its casters.
•
Never stand in front of the rack when it is rolling down the ramp from the pallet. Always
handle the rack from both sides.
WARNING:
To reduce the risk of personal injury or damage to the equipment, adequately
stabilize the rack before extending a component outside the rack. Extend only one component
at a time. A rack may become unstable if more than one component is extended.
WARNING:
When installing a server in a telco rack, be sure that the rack frame is adequately
secured at the top and bottom to the building structure.
Preparation procedures
To access some components and perform certain service procedures, you must perform one or more of
the following procedures:
•
Access the product front panel ("
Remove the security bezel (optional)
" on page
29
).
•
Power down the server (on page
30
).
If you must remove a server from a rack or a non-hot-plug component from a server, power down the
server.
•
Extend the server from the rack (on page
30
).
If you are performing service procedures in an Hewlett Packard Enterprise, Compaq branded, Telco,
or third-party rack cabinet, you can use the locking feature of the rack rails to support the server and
gain access to internal components.
For more information about Telco rack solutions, see the RackSolutions website
(
http://www.racksolutions.com/hp
).
•
Access the product rear panel (on page
33
).
•
Remove the server from the rack (on page
33
).
If the rack environment, cabling configuration, or the server location in the rack creates awkward
conditions, remove the server from the rack.
•
Remove the access panel ("
Access panel
" on page
40
).
•
Remove the air baffle (on page
34
).
•
Remove the PCIe riser cage ("
Remove the PCI riser cage
" on page
35
).
Remove the security bezel (optional)
The security bezel is only supported in servers using the quick-release latch rack ears.
Содержание ProLiant DL120 Gen9
Страница 5: ...Contents 5 Documentation feedback 117 Index 118 ...
Страница 13: ...Customer self repair 13 ...
Страница 14: ...Customer self repair 14 ...
Страница 15: ...Customer self repair 15 ...
Страница 26: ...Illustrated parts catalog 26 ...
Страница 36: ...Removal and replacement procedures 36 o Secondary PCI riser cage o PCI blank ...
Страница 116: ...Acronyms and abbreviations 116 UID unit identification USB universal serial bus ...