Removal and replacement procedures 57
c.
Finish the installation by completely tightening the screws in the same sequence.
4.
Install the air baffle.
5.
Install the access panel.
6.
Do one of the following:
o
Slide the server into the rack.
o
Install the server into the rack.
7.
Connect each power cord to the server.
8.
Connect each power cord to the power source.
9.
Press the Power On/Standby button.
The server exits standby mode and applies full power to the system. The system power LED
changes from amber to green.
Processor
WARNING:
To reduce the risk of personal injury from hot surfaces, allow the drives and the
internal system components to cool before touching them.
CAUTION:
To avoid damage to the processor and system board, only authorized personnel
should attempt to replace or install the processor in this server.
NOTE:
Replace a failed processor with the same model of replacement processor.
To remove the component:
1.
Power down the server (on page
30
).
2.
Remove all power:
a.
Disconnect each power cord from the power source.
b.
Disconnect each power cord from the server.
3.
Do one of the following:
o
Extend the server from the rack (on page
30
).
o
Remove the server from the rack (on page
33
).
Содержание ProLiant DL120 Gen9
Страница 5: ...Contents 5 Documentation feedback 117 Index 118 ...
Страница 13: ...Customer self repair 13 ...
Страница 14: ...Customer self repair 14 ...
Страница 15: ...Customer self repair 15 ...
Страница 26: ...Illustrated parts catalog 26 ...
Страница 36: ...Removal and replacement procedures 36 o Secondary PCI riser cage o PCI blank ...
Страница 116: ...Acronyms and abbreviations 116 UID unit identification USB universal serial bus ...