To install the backplane battery:
1.
Pull the battery retaining clip away.
Figure 57 Installing backplane battery
2.
Place the battery into the holder.
3.
Reattach the rear top cover (see "
System memory
CAUTION:
Remove power to the server by disconnecting the power cord before removing or installing system
memory.
See
for the location of the four 240–pin dual inline memory module (DIMM) sockets.
The sockets support up to 8 GB dual channel DDR2 533/667 MHz unbuffered low-pro
fi
le (1.2-inch)
synchronous dynamic random access memory (SDRAM) with error-correcting code (ECC) support.
Figure 58 Location of DIMM sockets
The four DIMM sockets are respectively CH_B DIMM1, CH_B DIMM0, CH_A DIMM1 and CH_A
DIMM0. All the low-pro
fi
le DIMMs must be the same speed. See the table below for installing one or
more modules in the sockets.
HP ProLiant DL100 G2 Storage Server administration guide
123
Содержание ProLiant DL100 G2 DPSS
Страница 12: ...12 ...
Страница 18: ...18 About this guide ...
Страница 26: ...26 The HP storage server solution ...
Страница 46: ...46 Storage management overview ...
Страница 134: ...134 Troubleshooting servicing and maintenance ...
Страница 152: ...152 Regulatory compliance and safety ...