Hardware options installation 72
d.
Connect the LED cable to the two-bay LFF drive cage backplane and to the six-bay LFF backplane.
e.
Proceed to step 17.
16.
Connect the SAS/SATA controller cable:
a.
Connect the main branch of the SAS/SATA controller cable to an optional SAS controller ("
Storage
controller option
" on page
84
).
b.
Connect the "6LFF" labeled connector to the two-bay LFF drive cage backplane.
For this cabling scenario, the "2LFF" labeled connector is not used.
c.
Coil the excess cable to minimize the impact to airflow.
17.
Install the fan cage.
18.
Install the air baffle.
19.
If removed, install the BBWC battery pack or the FBWC capacitor pack ("
Installing the BBWC battery
pack or the FBWC capacitor pack
" on page
86
).
20.
Install fan 5.
Содержание ProLiant DL G6
Страница 32: ...Operations 32 3 Remove the hard drive cage blank ...
Страница 92: ...Hardware options installation 92 o Rear 1 o Front 2 19 Remove the chassis from the tower side panels ...
Страница 106: ...Cabling 106 Six bay LFF backplane cabling Drive cage bay 1 Drive cage bay 2 ...
Страница 107: ...Cabling 107 Eight bay SFF drive cage cabling Drive cage bay 1 Drive cage bay 2 ...
Страница 110: ...Cabling 110 DVD ROM drive cabling Slimline optical drive cabling ...
Страница 115: ...Cabling 115 BBWC battery pack and FBWC capacitor pack cabling ...
Страница 138: ...Troubleshooting 138 ...
Страница 164: ...Technical support 164 ...
Страница 165: ...Technical support 165 ...