Hardware options installation 83
15.
Secure the 10G NIC connectors to the chassis with the retaining screw.
16.
Install the RJ-45 plugs on the bottom (rack model) or right (tower model) two RJ-45 connectors on the HP
NC375i adapter.
17.
Install the air baffle.
18.
If removed, install the BBWC battery pack or the FBWC capacitor pack ("
Installing the BBWC battery
pack or the FBWC capacitor pack
" on page
86
).
19.
Install fan 5.
20.
Install the access panel.
21.
Do one of the following:
o
Close or install the tower bezel, as needed.
o
Slide the server back into the rack.
22.
Connect the network cables.
23.
Power up the server (on page
22
, "
Powering up and configuring the server
" on page
40
).
Содержание ProLiant DL G6
Страница 32: ...Operations 32 3 Remove the hard drive cage blank ...
Страница 92: ...Hardware options installation 92 o Rear 1 o Front 2 19 Remove the chassis from the tower side panels ...
Страница 106: ...Cabling 106 Six bay LFF backplane cabling Drive cage bay 1 Drive cage bay 2 ...
Страница 107: ...Cabling 107 Eight bay SFF drive cage cabling Drive cage bay 1 Drive cage bay 2 ...
Страница 110: ...Cabling 110 DVD ROM drive cabling Slimline optical drive cabling ...
Страница 115: ...Cabling 115 BBWC battery pack and FBWC capacitor pack cabling ...
Страница 138: ...Troubleshooting 138 ...
Страница 164: ...Technical support 164 ...
Страница 165: ...Technical support 165 ...