Installing the Switch
Installation Procedures
610
eps
(
)
Status
A2
B1
B2
A1
Device
Connected
Status
Device
Connected
(
)
RPS
RPS
RPS
RPS
Pow er
Fault
hp procurve
J8169A
Fan/Temp Status flash = Temperature too high
Fan/Temp Fault flash = Fan failure
Fan/Temp Status
Internal Power Status
In Ready
Out Ready
Backup Power Ports Status
EPS Ports
Pair A
408 W total for PoE applications
EPS Ports: 50V
8.3A max each.
EPS A1
Power
EPS A2
EPS B1
Power
EPS B2
EPS Ports
Pair B
408 W total for PoE applications
100-240 V~ 7.5 A
Line: 50/60 Hz.
50 V
16 A
12 V
7.5 A
100-240 V~ 7.5 A
Line: 50/60 Hz.
50 V
16 A
12 V
7.5 A
100-240 V~ 7.5 A
Line: 50/60 Hz.
50 V
16 A
12 V
7.5 A
100-240 V~ 7.5 A
Line: 50/60 Hz.
50 V
16 A
12 V
7.5 A
Insta
lli
ng th
e Swi
tch
2-29
Содержание ProCurve Series 2600
Страница 2: ......
Страница 3: ...ProCurve Series 2600 Switches Installation and Getting Started Guide ...
Страница 60: ... This page is intentionally unused ...
Страница 82: ... This page is intentionally unused ...
Страница 92: ... This page is intentionally unused ...
Страница 101: ...Safety and EMC Regulatory Statements EMC Regulatory Statements Korea Taiwan C 9 Safety and EMC Regulatory Statements ...
Страница 108: ... This page is intentionally unused ...
Страница 115: ......