Index
C
Chassis views,
Configuration terminal problems,
Configuring basic IRF settings,
Configuring the switch,
Connecting the console cable,
Connecting the physical IRF ports,
Connecting the power cord,
Connecting the switch to the network,
Contacting HP,
Conventions,
Cooling system,
E
Examining the installation site,
F
Fan tray failure,
Fan trays,
G
Grounding the switch,
H
Hardware specifications,
I
Installation tools,
Installing the switch in a 19-inch rack,
Installing/removing a fan tray,
Installing/removing a power supply,
Installing/removing an LPU,
Interface failure,
IRF fabric setup flowchart,
L
LEDs,
LPU failure,
LPUs,
O
Other specifications,
P
Planning IRF fabric setup,
Ports,
Power supplies,
Power supply failure,
Powering on the switch,
R
Related information,
S
Safety recommendations,
Setting terminal parameters,
Setting up the configuration environment,
T
Testing connectivity,
Transceiver modules,
V
Verifying the installation,
Verifying the IRF fabric setup,
53
Содержание FlexFabric 7900 Series
Страница 5: ...iii Index 53 ...