
details for the logical units and a % completion value. See “
Storage (Status)
” on page 124 for
more information about these fields.
7.
Once the optimization has completed, the new shelf is shown as configured on all the Storage
pages. The following example shows the
Storage Pool
page.
D2D Backup System HP D2D4112
203
Содержание D2D
Страница 14: ...14 ...
Страница 18: ...About this guide 18 ...
Страница 30: ...Before you start 30 ...
Страница 52: ...Attaching a physical tape library or tape drive optional 52 ...
Страница 70: ...HP D2D Backup Systems and Fibre Channel 70 ...
Страница 106: ...Configuring and using replication 106 ...
Страница 178: ...Restore processes without replication 178 ...
Страница 196: ...you must create new cartridges Hard disk replacement 196 ...
Страница 204: ...Capacity Upgrade 204 ...
Страница 210: ...210 ...