
4 210 256 / 01
8
Assembly
Fig. 04
Head of screw
Fig. 05
9. Tighten the screw (6, fig. 02) to secure the burn-
er.
Insulate the space between the burn-
er pipe and the boiler flange with the
fireproof fibre supplied.
The circulating air-vents must not be
covered.
Ensure that,
- the fireproof fibre is packed firmly into the space in
order to prevent it falling out (figure 06)
Fireproof fibre
Fig. 06
10. Close the boiler flange with the burner once
again.
11. The oil feeds may be taken through the side
openings either on the right or the left.
12. Make plug-and-socket connections (7, fig. 07,
08). Pull the plug cable further out, to do this,
loosen the PG unions (8). The burner must be
connected to the boiler with the standard plug
connection.
The burner cable must be shortened so that to
swivel out the burner, it is essential to break the
plug connection.
7 8
Fig. 07
Содержание UltraOil 50
Страница 27: ...4 210 256 01 27 Maintenance 2 8 9 7 1 4 10 Fig 14 6 5 3...
Страница 43: ...4 210 256 01 43...