Commissioning
5.2 Filling the heating circuit
Filling of the heating system must be carried out by
equipment specialists. The filling water and supple-
mentary water must comply with the quality require-
ments in the relevant state or country (see chapter 5.1).
5.3 Filling the water heater (if fitted)
The heating boiler may also be put into service even
when the water heater is not filled.
5.4 Commissioning
Important:
On first putting into service, the proper func-
tion of all safety and regulator equipment is to
be checked.
Operation and maintenance of the plant must
be explained in detail to the operator.
Before commissioning, the neutralisation box
(where fitted) is to be filled with water.
5.5 Oil burner
Setting the burner must also be carried out by the
installing engineer and must correspond to the heat
requirement of the plant.
For this purpose, please use the technical informa-
tion / installation instructions supplied with the burn-
er.
Burners are fitted with oil preheating
and when restarted are ready for op-
eration again after about 2 minutes’
delay.
5.6 Handover to the operator / storage
Have the operator confirm in writing that the meth-
ods of operating and service procedures have been
explained and that he has received a copy of the
relevant operating instructions (according to sample
page 44). The machinery manufacturer is responsi-
ble for providing operating instructions for the whole
plant: the technical information / installation instruc-
tions must be kept with the plant all the time.