
4 210 256 / 01
6
Assembly
2.2.1 Design variants
i
Before commissioning, the neutrali-
sation box (if fitted) must be filled with
neutralisation granulate (figure, chap-
ter 6.4).
Before putting into service, the si-
phon and the neutralisation box must
be filled with water.
The water can be filled through the
cleaning opening into the neutralisa-
tion box and the siphon.
Possibility 1
• Stand version with siphon
• With neutralisation, condensate discharge into
lower drain line.
• Drain optionally on the left or right side
.
1
3
2
Possibility 2
• Design with neutralisation box
• For condensate discharge in lower drain line, incl.
condensate neutralisation.
1
3
2
Possibility 3
• Siphon and condensate delivery pump
• Without neutralisation, condensate discharge into
higher drain line.
i
The condensate delivery pump must
be installed in accordance with the
enclosed instructions.
1
2
Possibility 4
• Neutralisation box and condensate delivery pump
• With condensate neutralisation - condensate dis-
charge into higher drain line.
i
The condensate delivery pump must
be installed in accordance with the
enclosed instructions.
3
2
1
4
Содержание UltraOil 50
Страница 27: ...4 210 256 01 27 Maintenance 2 8 9 7 1 4 10 Fig 14 6 5 3...
Страница 43: ...4 210 256 01 43...