14
4 214 858 / 01
ASSEMBLY
2.8
Installation of burner
1.
Open the boiler flange (4 locking screws) and check
the installation position of the combustion chamber
unit.
NOTICE
The combustion chamber insert must be se-
cured in the middle aluFer
®
pipe. If secured
correctly, the combustion chamber insert can
be rotated and does not tip over.
4210258_BrennkBrennkammereinsatz
A
A
1 9
~
4210258_BrennkBrennkammereinsatz
A
A
1 9
~
Combustion chamber insert
Fig. 12
For installation of the burner see the enclosed
”HO F30E1-2 / F35E1- 2 oil burner”
installa-
tion manual.
Don›t forget to insulate the intermediate spa-
ce between the burner tube and boiler flange
with the included fireproof fibre (Fig. 13).
Note that:
the fireproof fibre must be packed firmly into
the cavity to prevent it falling out
Fireproof fibre
Fig. 13
2. After the installation of the burner, close again the bo-
iler flange and tighten the lock nut.
3. Establish the plug-in connections. Pull the plug ca-
bles out further by releasing the high-strength cable
glands.
- The burner must be connected to the boiler with the
standard plug-in connection.
- The burner cable must be shortened so that the plug-
in connection has to be parted to swing out the bur-
ner.
4. Replace the sound insulation hood, see page 12.
Содержание 42-UltraOil 110
Страница 39: ...39 4 214 858 01...