
13
4 214 858 / 01
ASSEMBLY
2.7
Fitting the siphon
!
WARNING
Attach the siphon (40, Fig. 11), which is sup-
plied loose.
Before commissioning, the siphon and the
neutralisation box (if fitted) must be filled with
water in order to prevent flue gas leakage.
40
41
Optional
Fig. 11
Place the condensate box (option) (41, Fig. 11) behind
the boiler and establish the electrical connection.
Fit connecting line between siphon and condensate box.
Содержание 42-UltraOil 110
Страница 39: ...39 4 214 858 01...