
13
2. Sequence Flow Chart
F/S
chec
k
1 t
o 3-min.
timer
in contr
ol
(S4 dip s
witch
1 & 2)
"G" Contr
ol Boar
d Sequence Flo
w Char
t
1.
1
-Min
ut
e F
ill
C
ycl
e
Cy
cle St
eps
2.
Har
vest Cy
cle
•
WV
time:
6
min.
or
the
length
of
har
vest
min
us
50
sec.
(S4 dip s
witch 7), whiche
ver is shor
ter
.
•
Maxim
um
har
vest
time:
20
min.
Ther
mist
or
in contr
ol
3.
F
reez
e Cy
cle
•
Minim
um
fr
eez
e
time:
5
min.
•
Maxim
um
fr
eez
e
time:
fr
eez
e
timer
set
ting
(S4 dip s
witch 9 & 1
0)
F/S
in contr
ol
4.
P
ump-Out Cy
cle
•
Fact
or
y
set
for
e
ver
y
10th c
ycle
(S4 dip s
witch 5 & 6)
•
PM
st
ops
, then
D
VR
ener
giz
es
, ener
gizing
PM and D
V
(S4 dip s
witch 3 & 4)
WV
ener
giz
ed
F/S
open
WV
contin
ues
Comp
ener
giz
ed
FMRs
ener
giz
ed
HGVs
ener
giz
ed
Ther
mist
or t
emper
atur
e
reaches 48
°F (9°C)
(3.9
kΩ or less).
Har
vest timer st
ar
ts
.
F/S
open
Comp
contin
ues
FMRs
contin
ue
PM
contin
ues
LL
Vs
ener
giz
ed
HGVs
de-ener
giz
ed
F/S
closed
Comp/FMRs
contin
ue
WV
ener
giz
es
PM
st
ops f
or 2 sec.
DV
R
ener
giz
es
, ener
gizing
PM
and
DV
for 1
0 sec.,
each 1, 2, 5, or 1
0 c
ycles
.
HGVs
ener
giz
ed
LL
Vs
de-ener
giz
ed
F/S
chec
k
S
ar
tup begins
her
e af
ter 5-sec.
dela
y
If
F/S
is open, compr
essor st
ops and c
ycle r
etur
ns t
o 1
-Min
ut
e F
ill C
ycle
5-min.
timer in
contr
ol
F/S
closed
F/S
open or fr
eez
e
timer t
er
minat
es
50 sec.
PM
ener
giz
ed
WV
de-ener
giz
ed
Har
vest P
ump
Timer
KMS-822MLH/SRK-1
0H
Leg
end:
BC
–bin contr
ol
Comp
–compr
essor
DV
–dr
ain v
al
ve
DV
R
–dr
ain v
al
ve r
ela
y
FMRs
–f
an mot
or
s-r
emot
e
F/S
–fl
oat s
witch
HGVs
–hot g
as v
al
ves (KMS and SRK)
LL
Vs
–liquid line v
al
ves (KMS and SRK)
PM
–pump mot
or
WV
–inlet w
at
er v
al
ve
1.
Bin F
ull
Shutdo
wn Dela
y:
•
Fill Cy
cle
– 1
5 sec.
af
ter activ
ation.
•
Har
vest Cy
cle
–
At the end of the har
vest c
ycle
, or up t
o 1
5 sec.
int
o the
fr
eez
e c
ycle if activ
at
ed at the end of the har
vest c
ycle
.
•
Fr
eez
e Cy
cle
– 1
5
sec.
af
ter activ
ation if activ
at
ed at least 1
5 sec.
bef
or
e
the 5-min.
shor
t c
ycle pr
ot
ection timer t
er
minat
es
.
Otherwise
, at the end of the ne
xt har
vest c
ycle
.
Shutdo
wn
and R
estar
t
BC Oper
ation
BC
open
Gr
een
"BC
CL
OSED"
LED
of
f
Yello
w
"BC
OPEN"
LED
on
Yello
w
"BC
OPEN"
LED
contin
ues
All components de
-ener
giz
ed
2.
Icemak
er Of
f
All
components
de-ener
giz
ed.
3.
Ice Le
vel Lo
w
er
ed
Ice le
vel lo
w
er
ed.
No ice
pr
essing
ag
ainst
BC
actuat
or
paddle
. Icemak
er st
ar
ts at
"1
. 1
-Min
ut
e
F
ill
C
ycle
."
To 1 abo
ve
BC
closed
Gr
een
"BC
CL
OSED"
LED
on
Yello
w
"BC
OPEN"
LED
of
f
Components Ener
giz
ed when the Contr
ol S
witc
h is in the "W
A
SH" P
osition
The
"W
A
SH"
position
on
the
contr
ol
s
witch
is
used
when
cleaning
and
sanitizing
the
unit.
W
hen
in
the
"W
A
SH"
position,
po
w
er is supplied t
o the pump mot
or
. W
ith the cleaning v
al
ve closed, the cleaner and sanitiz
er fl
ow o
ver the outside of
the e
vapor
at
or plat
e assemb
ly
. W
ith the cleaning v
al
ve open, the cleaner and sanitiz
er fl
ow o
ver both the outside and the
inside of the e
vapor
at
or plat
e assemb
ly
.
Not
e:
Close the cleaning v
al
ve af
ter cleaning and sanitizing ar
e complet
e, otherwise the unit will not r
e-st
ar
t when the
contr
ol
s
witch
is
placed
in
the
"ICE"
position.