46
6. REMOVAL AND REPLACEMENT OF WATER REGULATING VALVE -
WATER-COOLED MODEL ONLY
IMPORTANT
Always install a new Drier every time the sealed refrigeration system is
opened. Do not replace the Drier until after all other repairs or replacement
have been made.
1) Turn off the power supply, remove the panels and close the Water Supply Line Shut-
off Valve.
2) Recover the refrigerant and store it in an approved container.
3) Disconnect the Capillary Tube using brazing equipment.
4) Disconnect the Flare-connections of the valve.
5) Remove the screws and the valve from the Bracket.
6) Install the new valve, and braze the Capillary Tube.
7) Install the new Drier.
8) Check for leaks using nitrogen gas (140 PSIG) and soap bubbles.
9) Connect the Flare-connections.
10) Evacuate the system, and charge it with refrigerant. See the Nameplate for the required
refrigerant charge and type.
11) Open the Water Supply Line Shut-off Valve, and turn on the power supply.
12) Check for water leaks.
13) See “IV. 1. ADJUSTMENT OF WATER REGULATING VALVE.” If necessary, adjust
the valve.
14) Replace the panels in their correct position.
Содержание F-800MAF
Страница 9: ...9 2 CONDENSER UNIT URC 6F ...
Страница 15: ...15 III TECHNICAL INFORMATION 1 WATER CIRCUIT AND REFRIGERATION CIRCUIT F 800MAF C ...
Страница 16: ...16 F 800MWF C ...
Страница 17: ...17 2 WIRING DIAGRAMS F 800MAF C F 800MWF C ...
Страница 19: ...19 b When Reservoir has been filled Gear Motor starts immediately ...
Страница 20: ...20 c Compressor starts about 60 sec after Gear Motor starts ...
Страница 21: ...21 d Bin Control operates and about 6 sec later Compressor and Gear Motor stop simultaneously ...
Страница 22: ...22 e Low Water Except Water cooled Model ...
Страница 24: ...24 g When Flush Switch is moved to FLUSH position Flush Water Valve opens and flushes Reservoir and Evaporator ...
Страница 25: ...25 h When Flush Timer operates for 15 min every 12 hours ...