Rotor change
After choosing a rotor from the table it must be
installed in the metering unit.
¾
Empty the seed hopper, if possible, before
changing the rotor.
¾
Unscrew the side cover.
¾
Pull out the rotor with the drive shaft.
Rotor change
¾
Remove lock washer and washer.
¾
Pull out the drive shaft and assemble the
new rotor.
The drive shaft requires axial clearance in the
rotor for self-cleaning of the rotor in the meter-
ing housing.
Changing the rotor
The setting of sealing lip and the concentricity
of the rotor must be checked after each rotor
change.
Rotor change with gate
valve
Changing the rotor while the hopper is full is
easier if a gate valve is provided above the
metering unit.
¾
Pull out the gate valve (1).
1
2
Gate valve pulled out
¾
Change the rotor as described in
rotor change
.
¾
Push in the gate valve and let it engage (2).