![horsch Partner 1600 FT Скачать руководство пользователя страница 34](http://html1.mh-extra.com/html/horsch/partner-1600-ft/partner-1600-ft_operating-instructions-manual_2164106034.webp)
Checks before and during use on
the field
NOTE
¾
Perform checks when starting work and with
larger fields also regularly in between!
The working quality essentially depends on the
adjustments and checks made prior to and dur-
ing use, as well as on regular care and mainte-
nance of the machine.
¾
Carry out all maintenance tasks and
adjustments before starting to work.
Pneumatic system
¾
Have the hydraulic lines been connected
without being mixed up by mistake?
¾
Is the hydraulic fan connected to a pressure
free return flow?
¾
Check the return pressure on the pressure
gauge, see also chapter
Pneumatic system
.
¾
Are all air lines between fan and coulters leak
tight and firmly connected?
¾
Does air flow uniformly out on all coulters?
Metering unit
¾
Have the sealing lips in the metering unit been
adjusted and are they still serviceable?
¾
In case of small seed, has the cleaning brush
been installed and is it in order?
¾
In the case of large seed, has the scraper been
installed?
¾
Are all connections air tight and has the clear-
ing valve been closed firmly and leak free?
¾
Does fertiliser or seed flow from all coulters?
¾
Is seed bridging forming in the hopper (par-
ticularly with husky seed)?
¾
Is, especially in the case of small seed, the
correct seed quantity being placed?
Work quality
¾
Check the quality of fertilising or sowing.
30
Содержание Partner 1600 FT
Страница 2: ......
Страница 5: ......
Страница 19: ...Position of safety stickers 15...
Страница 68: ......