Honeywell LCBS Connect Скачать руководство пользователя страница 3

LCBS CONNECT SOLUTION

3

31-00118EFS—01

Accessory Loop, Multispeed Fan Control.

 Each LCBS Connect controller provides the ability to configure custom 

control loops to control other equipment including exhaust fans, exhaust pressurization loops, cabinet unit heat-
ers, blower coils, and outdoor lighting circuits based on ambient light level. These loops are called "Accessory 
Loops." LCBS Controllers also provide unprecedented control of CVAHU fans that we call Multispeed Fan. This fea-
ture not only ensures building occupant comfort, but when applied properly, results in energy cost avoidance to 
building owners. 

Honeywell Cloud Based Remote Control and Service Analytics… A New Honeywell Feature! 

Data is sent 

securely from a building site via the internet to the Honeywell Cloud where extensive analysis is performed. The 
output of this analysis is useful information that will allow service contractors to do service more efficiently and 
effectively and retain valuable service contracts.

Background

The LCBS Connect system provides comprehensive control options for constant volume air handling units (CVAHU). In 
addition to heating, air conditioning, dehumidification, and ventilation applications, critical data from LCBS Connect 
controllers is collected, stored, and analyzed in the Honeywell Cloud. The data can be used for logging, sophisticated 
graphic display, advanced service alerting and "big data" analytics. Honeywell data scientists and engineers are relying 
on hundreds of years of control and service experience to write analytics that will help service contractors assist building 
owners to predict and prevent service issues from occurring, resulting in superior equipment uptime and extended HVAC 
equipment life. These analytics run in the cloud 24 hours a day, 365 days a year. 

Honeywell has an incomparable industry reputation for providing precise temperature control, superior remote and local 
operator interface experience. With the addition of cloud based data collection and data analytics, Honeywell steps to the 
front again.

The primary focus for LCBS Connect is control of CVAHU rooftop units and split systems. Over 60% of commercial 
buildings in North America are heated and cooled by CVAHU packaged and split systems. The average age of this HVAC 
equipment is approximately eight (8) to 10 years. Due to lack of appropriate service, many suffer from operational 
problems including temperature, pressure, humidity sensing devices that are out of calibration, refrigeration circuits 
improperly under and overcharged for a variety of reasons, economizer ventilation cycles that have ceased to function, air 
flow systems improperly sized delivering substandard air flow, and thermostats in common buildings that "fight" each 
other due to improper occupant intervention. 

LCBS Connect. Extending HVAC Equipment Life

The average estimated life of packaged constant volume air handling systems is about 17-25 years, depending on where 
the system is located. At eight (8) years, these systems are ripe for 1] restorative service and 2] re-control for reasons 
listed above. With service contractor assistance, a user of these systems can delay capital appropriation and expenditure 
by up to five (5) years by restoring these units to initial, "as built" specified operation. Restored equipment operates less 
resulting in lower energy costs. Ongoing maintenance costs are reduced as "tuned up" equipment operates efficiently and 
effectively. After this work is done, Honeywell offers LCBS Connect Cloud Services that will help HVAC service contractors 
keep HVAC equipment operating in a highly efficient manner and delivering extended equipment life.

What you will learn by reading this document

Each section consists of three (3) sections. First, "theory and operation" includes a short description about 
why we do what we do and how it works. Second, a more complete description of "how it works" is provided. 
Third, wiring diagrams are provided to demonstrate how an installer wires up the application. Technically, this 
is in the "appendix" of this document. 

Controls in Small Commercial Buildings

In commercial buildings, it is essential that heating and air conditioning systems operate in a properly configured, 
automatic manner. In a small commercial building, HVAC operational experts are often HVAC service contractor 
specialists or by a few subject matter experts within the building. Additionally, control performed in a small commercial 
buildings is typically more complex than in a residential dwelling. Heating, cooling, fan operation, ventilation, indoor air 
quality, dehumidification, and various other functions can all operate successfully in a small commercial building but due 
to economics, we can't count on an experienced controls experts to be present to troubleshoot building controls 
problems. 

Herein lies a point of concern for servicing contractors and building owners as we strive to effectively control small 
commercial buildings. Honeywell and our contractor business partners need to provide basic local control for building 
owners. The more power and authority that building occupants have is desirable, but can also lead to undesirable system 
operation, particularly higher energy use and HVAC equipment wear and tear. It is important that Honeywell LCBS 
Connect contractors to educate building owners about key control requirements. 

Содержание LCBS Connect

Страница 1: ... General Economizer Operation 9 Honeywell Integrated Economizer Control Described 10 Honeywell Integrated Economizer Control Climate Zones 12 Honeywell Integrated Economizer Control High Limit and Changeover Strategies 12 Strategy 1 Differential Enthalpy with Fixed Dry Bulb Temperature Limit 12 Strategy 2 Outdoor Air Enthalpy 12 Strategy 3 Differential Temperature 12 Strategy 4 Outdoor Temperature...

Страница 2: ... Gateway that permits controller data to be sent from individual CHAHU controllers via the internet to the new LCBS Connect Cloud The new Honeywell Cloud capability gives our control system users unprecedented access to data remotely via standard smart phones tablets and personal computers Honeywell also performs data analysis called analytics that will permit service contractors and building owne...

Страница 3: ...entilation cycles that have ceased to function air flow systems improperly sized delivering substandard air flow and thermostats in common buildings that fight each other due to improper occupant intervention LCBS Connect Extending HVAC Equipment Life The average estimated life of packaged constant volume air handling systems is about 17 25 years depending on where the system is located At eight 8...

Страница 4: ... work LCBS Connect allows HVAC service contractor and customers to develop schedules via LCBS Connect tools including local operator interface or remote cloud based tool to match building occupancy schedules These schedules can be also be set to accommodate occurrence of special events and holidays To ensure that proper comfort conditions are achieved by desired occupancy Honeywell has developed a...

Страница 5: ...tice is observed Tip Use standby set points in infrequently occupied building zones including meeting rooms and break rooms Available This is a fourth condition indicating that a change of event state can be programmed configured exe cuted This is also referred to as un configured How it works Date and Time is available for each LCBS Connect controller Each LCBS controller can support for events F...

Страница 6: ...r heating directly or the supply fan can be controlled by a fan and limit device The latter is quite common with gas heating systems We support control of three stages of heat three stages of cool Further electric heat can typically be cycled more frequently and aggressively than gas heat LCBS Connect accounts for both methods and all settings Air to Air Heat Pump In North America there are areas ...

Страница 7: ...arge air temperature to the set point Let s assume that the discharge air set point is 120 F If the discharge air temperature increases above 120 F then the heating equipment is cycled off When it falls back below the limit minus the switching differential it will be allowed to cycle back on Please note Your HVAC unit will feature a high limit heating control Ensure that the LCBS Connect setting i...

Страница 8: ...ling and heating can be programmed to operate in a reheat sequence to provide precise dehumidification operation Second dehumidification equipment can be controlled through a direct LCBS Connect output to provide dehumidification Third extended cooling extended runtime can be selected that can enhance and augment the dehumidification process These are described in detail below Method 1 Cooling On ...

Страница 9: ...90 1 2010 Section 6 5 1 or to your local building code for ventilation and economizer codes This choice would also be used for systems that aren t connected to a fresh air ventilation function like many commercial split systems Enable Economizer Function Second there are hundreds of thousands of economizers that are controlled by a stand alone collection of economizer controls typically provided b...

Страница 10: ...al output can be used to carry 24 VAC to a packaged economizer system By definition during building unoccupied schedule the contact is open disabling the economizer This typically allows a spring return actuator to close to 100 position NOTICE Opportunity to upgrade your customer s system and provide trusted advisor service Using the integrated techniques described above you will be able to 1 impr...

Страница 11: ...ng range Over 8M of the control systems we ve provided to the HVAC industry have these set points hard coded in the devices with literally no complaints callbacks or service interventions Fig 3 Pacific Northwest National Laboratory Oak Ridge National Laboratory August 2010 http www1 eere energy gov buildings publications pdfs building_america ba_climateguide_7_1 pdf Table 2 When the mixed air cont...

Страница 12: ...with all economizer limit and changeover strategies LCBS Connect remote services alerting and analytics can help you fine tune setting to maximize customer energy savings and maintain comfort There is an ASHRAE prescriptive value suggestion at 28 LB BTU changeover Many folks find this a bit warm and could result in customer client comfort issues How does it work If there is a call for cooling and ...

Страница 13: ...ted to the LCBS controller If the freeze stat is configured and the LCBS Connect controller input is closed the CVAHU system will be shut down The freeze stat function can also be used to shut down the CVAHU system for smoke or fire alert alarm Economizer Control Summary LCBS Connect controllers feature an ASHRAE Complete range of economizer control changeover and high limit options If you are att...

Страница 14: ...plication the response time to the equipment being controlled and the control algorithm being used The narrower smaller the throttling range the more precise the control and the wider larger the throttling range the more stable the control The objective is setting the throttling range to achieve the optimum balance between precision and stability Set point and Differential Refresher On Off Digital...

Страница 15: ...ve and will continue to increase as long as the proportional error is greater than 0 The increase in the output signal will drive the controlled device further open and the controlled medium will be brought closer to set point While the proportional error is reduced the integral error will continue to increase until the proportional error is eliminated PROPORTIONAL ON OFF CONTROL HEATING REVERSE A...

Страница 16: ...For example if you want to control outdoor lights the integration feature doesn t add to the quality of control and the integration timer should be set to zero 0 Simple set point and differential are the only parameters that need to be set Do You Want to Know More about Integral Control As a starting point the LCBS Connect controller uses the dependent gains form of the PID equation This means tha...

Страница 17: ...t the primary function of human respiration is to obtain oxygen for use by body s cells and eliminate carbon dioxide that cells produce The less content of carbon dioxide in the air the less presence of human respiration and humans exists This makes people drowsy ill and worse Find levels and associated human impact of CO2 in confined building spaces provided by Engineering Tool Box Source http ww...

Страница 18: ...building space Our automatic control system begins to reset minimum ventilation rates from our minimum ventilation damper position level to our minimum DCV ventilation damper position This reset will dynamically continue based on sensed carbon dioxide PPM level in the space Demand Controlled Ventilation Summary LCBS Connect controllers can provide mitigation strategy based on the increase of CO2 a...

Страница 19: ...F out side air temperature and a recovery of 8 F per hour at 55 F The minimum recovery rate is 3 F per hour and the maximum recovery rate is 8 F per hour Adaptive Intelligent Recovery Summary You will need to understand how your equipment is sized in relationship to heating and cooling load in the middle of summer and winter and during transitional climate season It is absolutely essential that yo...

Страница 20: ... can control The motor will have two sets of windings this motor is typically provided by an HVAC OEM or by a motor supplier directly One set is energized for one discrete speed and the other set energized for the second discrete speed If you encounter a motor like this it is already wired to control the two discrete speeds with LCBS Connect controller Again note that the speeds are probably uncha...

Страница 21: ...own above do NOT use the two fan speed logic provided by LCBS controller Two Speed and Multispeed VFD Application The LCBS Controller sends a control signal 0 10 VDC to a VFD that changes frequency and the speed of the supply fan motor NOTES 1 Consult with VFD manufacturer to ensure that the supply fan motor in your constant volume air handling unit is able to be controlled by the VFD As time goes...

Страница 22: ...of heat and ventilation mode at the same low rate 40 I want to reduce fan speed during first stage cool to 60 I want the fan to run at 80 for multistage heat and cool HVAC modes Please refer to the diagram below to describe how we want the system supply fan will work Fig 10 Following the diagram from left to right just above and to the left note that if there is a call for unoccupied heat the fan ...

Страница 23: ...ume that a heating blower coil is in a loading dock and that the dock is open from 6 AM in the morning to midnight Because this is a heating blower coil our primary requirements during occupancy would be 1 the comfort of the loading dock employees and 2 good even temperature control During unoccupied times from midnight to 6 AM out primary requirement is keeping pipes product and equipment from fr...

Страница 24: ...ameters you want to implement Go to LCBS Connect wall module or LCBS Connect Remote User Interface and input desired values It is absolutely essential that you understand concepts that are presented above so that you can commission an effective accessory loop strategy SERVICE ALERTING THEORY AND FUNDAMENTALS As fuel costs have increased in the last half of the 20th Century and the first part of th...

Страница 25: ...nal load zone demand of 130 min 162 or lower indicates that mechanical or electric heating is not matching zone building heat exchange demand Your story You have a maintenance contract with your customer to monitor heating and cooling efficiency If you receive and alert for 120 for cooling or 120 for heating you are beginning to lose capacity for some reason This could be a result of heat exchange...

Страница 26: ...ll below 600 PPM the timer is reset You can further create a custom message and make sure that your best service technician gets a custom e mail message and an SMS message indicating that a CO2 level alert has occurred Again you can further create a custom message and make sure that your best service technician gets a custom e mail message and an SMS message By definition this technician will be p...

Страница 27: ...DIGITAL FLOW SWITCH THAT MEASURES ENTERING AND LEAVING AIR ACROSS THE SUPPLY FAN FREEZE STAT INDICATES THE STATE OF THE FREEZE STAT DIGITAL INPUT ALSO CALLED COIL FREEZE IF THIS CONDITION IS DETECTED LCBS CONTROLLER LOGIC WILL SHUT OFF SUPPLY FAN USER CONFIGURED INPUT MONITOR SWITCH INDICATES THE STATE OF THE MONITOR SWITCH DIGITAL INPUT UP TO CONFIGURER S IMAGINATION AND ALERTING REQUIREMENTS RET...

Страница 28: ...E FILTER WHEN THE INPUT UI5 IS CONFIGURED TO MEASURE FILTER PRESSURE THIS INPUT CAN BE USED TO MONITOR AND MEASURE FILTER STATIC FILTER LOAD LIMIT CAN BE SET TO INDICATE WITH FILTER USE BECOMES INEFFECTIVE MIXED AIR TEMPERATURE MIXED AIR TEMPERATURE IS A USEFUL ALERTING POINT TO SERVICE ECONOMIZER USE THIS SENSOR IS ALSO ENTERING SYSTEM TEMPERATURE AND IS NECESSARY FOR MOST UPCOMING HEATING AND CO...

Страница 29: ...CE HUMIDITY SYLK ADDRESS 3 TEMPERATURE TEMPERATURE MEASURED BY TR40 REMOTE WALL MODULE AT SYLK BUS ADDRESS 3 SAME BENEFITS AS SPACE TEMPERATURE SYLK ADDRESS 4 TEMPERATURE TEMPERATURE MEASURED BY TR40 REMOTE WALL MODULE AT SYLK BUS ADDRESS 4 SYLK ADDRESS 5 TEMPERATURE TEMPERATURE MEASURED BY TR40 REMOTE WALL MODULE AT SYLK BUS ADDRESS 5 SYLK ADDRESS 6 TEMPERATURE TEMPERATURE MEASURED BY TR40 REMOTE...

Страница 30: ...TS LIST THOSE IN RED ARE FIXED TO SINGLE INPUT OR OUTPUT DEFINITION I O NAME OF INPUT OUTPUT POINT S MCR36706 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 24VAC COM 24VDC 24VAC R W1 W2 W3 OB G L Y1 Y2 Y3 G L RH RC COM AUX DO1 AUX G UI 1 DI 2 DI 3 UI 4 UI 5 UI 6 UI 2 UI 3 COM COM COM DI 4 DI 1 COM AO 3 AO 1 COM A0 2 COM NET 1 NET 2 S...

Страница 31: ...SSORY LOOP STAGE ACCESSORY LOOP AUX CONTROL POINT MCR36708 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 24VAC COM 24VDC 24VAC R W1 W2 W3 OB G L Y1 Y2 Y3 G L RH RC COM AUX DO1 AUX G UI 1 DI 2 DI 3 UI 4 UI 5 UI 6 UI 2 UI 3 COM COM COM DI 4 DI 1 COM AO 3 AO 1 COM A0 2 COM NET 1 NET 2 S BUS S BUS SHIELD EGND LCBS CONTROLLER LCBS CONNECT...

Страница 32: ...1 32 33 34 35 36 37 38 39 40 24VAC COM 24VDC 24VAC R W1 W2 W3 OB G L Y1 Y2 Y3 G L RH RC COM AUX DO1 AUX G UI 1 DI 2 DI 3 UI 4 UI 5 UI 6 UI 2 UI 3 COM COM COM DI 4 DI 1 COM AO 3 AO 1 COM A0 2 COM NET 1 NET 2 S BUS S BUS SHIELD EGND LCBS CONTROLLER SYLK BUS 24 VAC CONTROLLER POWER LCBS CONTROLLER WALL MODULE C7250A MA SENSOR C7250A DA SENSOR HVAC SYSTEM 24 VAC POWER EXISTING TRANSFORMER LCBS CONNECT...

Страница 33: ...ERMITS CONTROLLED OPERATIONAL TRANSITION OF HEATINGAND COOLING EQUIPMENT FROM UNOCCUPIED TO OCCUPIED TO 1 GUARD AGAINST EQUIPMENT OVERUSE AND 2 HELP CONTROL POTENTIAL ELECTRICAL SPIKES RESULTING IN DEMAND CONTROL UTILITY CHARGES SYSTEM SUPPLY FAN AUTOMATICALLY OPERATES IN A CONTINUOUS MANNER DURING OCCUPIED PERIODS AND CYCLES ON A CALL FOR HEATING OR COOLING DURING UNOCCUIPED PERIODS TO MEET THE N...

Страница 34: ...GS BY REDUCING EQUIPMENT OPERATION DURING UNOCCUPIED PERIODS ADAPTIVE INTELLIGENT RECOVERY IS ALSO A STANDARD FEATURE IT PERMITS CONTROLLED OPERATIONAL TRANSITION OF HEATING AND COOLING EQUIPMENT FROM UNOCCUPIED TO OCCUPIED TO 1 GUARD AGAINST EQUIPMENT OVERUSE AND 2 HELP CONTROL POTENTIAL ELECTRICAL SPIKES RESULTING IN DEMAND CONTROL UTILITY CHARGES SYSTEM SUPPLY FAN AUTOMATICALLY OPERATES IN A CO...

Страница 35: ...NDOOR AIR QUALITY ISSUE SEE APP GUIDE FOR DETAILED SEQUENCE SETBACK AND ADAPTIVE INTELLIGENT RECOVERY WORKS PER APPLICATION GUIDE SYSTEM SUPPLY FAN AUTOMATICALLY OPERATES IN A CONTINUOUS MANNER DURING OCCUPIED PERIODS AND CYCLES ON A CALL FOR HEATING OR COOLING DURING UNOCCUIPED PERIODS TO MEET THE NEED OF PREVAILING BUILDING CODES LCBS CONNECT INFORMATION OS DESCRIPTION YCRL6438SR LCBS CONTROLLER...

Страница 36: ...IAL ENTHALPY CONTROL AND HIGH TEMPERATURE LIMIT SEE APP GUIDE FOR DETAILED SEQUENCE CONFIGURER HAS THE ABILITY TO SET UP SETBACK SETUP FEATURES THAT WILL ENABLE BUILDING OWNER TO ACHIEVE ENERGY SAVINGS BY REDUCING FAN AND COOLING EQUIPMENT OPERATION DURING UNOCCUPIED PERIODS ADAPTIVE INTELLIGENT RECOVERY IS ALSO A STANDARD FEATURE IT PERMITS CONTROLLED OPERATIONAL TRANSITION OF COOLING EQUIPMENT F...

Страница 37: ...WILL OPERATE THE HEAT PUMP AUXILIARY HEAT BASED ON CONFIGURER SELECTED HEATING SETPOINT IN THE SAVINGS MODE THE HEATING SETPOINT IS DEPRESSED SO THAT ELECTRIC AUXILIARY HEAT OPERATES LESS FREQUENTLY REFER TO APPLICATION GUIDE TO REFERENCE SETUP SETBACK OPERATION AS WELL AS ADAPTIVE INTELLIGENT RECOVERY OPERATION SYSTEM SUPPLY FAN AUTOMATICALLY OPERATES IN A CONTINUOUS MANNER DURING OCCUPIED PERIOD...

Страница 38: ... THE HEATING SETPOINT IS DEPRESSED SO THAT ELECTRIC AUXILIARY HEAT OPERATES LESS FREQUENTLY REFER TO APPLICATION GUIDE TO REFERENCE SETUP SETBACK OPERATION AS WELL AS ADAPTIVE INTELLIGENT RECOVERY OPERATION SYSTEM SUPPLY FAN AUTOMATICALLY OPERATES IN A CONTINUOUS MANNER DURING OCCUPIED PERIODS AND CYCLES ON A CALL FOR COOLING DURING UNOCCUIPED PERIODS TO MEET THE NEED OF PREVAILING BUILDING CODES ...

Страница 39: ...COOLING CONTINUES TO OPERATE BASED ON COOLING SETPOINT SECOND AN LCBS CONNECT CONTROLLER OUTPUT CAN BE PROGRAMMED TO CONTROL A DEHUMIDIFICATION UNIT LIKE A DX DEHUMIFIER OR DESSICANT SYSTEM IF A CALL FOR DEHUMIDIFICATION EXISTS THE SELECTED SYSTEM OPERATES INDEPENDENTALY OF LCBS CONTROL FUNCTIONS THE CONFIGURER CAN ALSO SET A RUN ON TIMER THAT OPERATES AFTER THE CALL FOR DEHUMIFICATION ABATES UP T...

Страница 40: ...EQUIPMENT FROM UNOCCUPIED TO OCCUPIED TO 1 GUARD AGAINST EQUIPMENT OVERUSE AND 2 HELP CONTROL POTENTIAL ELECTRICAL SPIKES RESULTING IN DEMAND CONTROL UTILITY CHARGES MULTISPEED FAN OPTION PERMITS CUSTOMIZED CONTROL OF FAN SPEED AND CAN BE INDEXED TO SPECIFIC MODES THERE ARE TWO DISCRETE MODES LOW FAN REGULARY FAN THAT CAN BE COUPLED WITH MULTIPLE CONTROL MODES SUCCESSFULLY IMPLMEMENTED ENERGY COST...

Страница 41: ...UP FOR THE PRIMARLY CVAHU ROOFTOP UNIT SPLIT SYSTEM REFER TO APPLICATION NARRATIVE FOR FURTHER INFORMATION ABOUT SET UP AND OPERATION NOTE ZERO OUT INTEGRAL TIMING FOR LOOP TO WORK CORRECTLY FOLLOW SENSOR PROVIDERS INSTALLATION MATERIAL FOR GUIDEANCE TO SET PROPORPORTIONAL THROTTLING RANGE LCBS CONNECT INFORMATION OS DESCRIPTION YCRL6438SR LCBS CONTROLLER WITH WALL MODULE LCBS CONNECT COMPONENTS S...

Страница 42: ...IOXIDE SENSOR C7400S OUTSIDE AIR ENTHALPY SENSOR C7400S RETURN AIR ENTHALPY SENSOR POLARITY INSENSITIVE TR40 SPACE SENSOR POLARITY INSENSITIVE TR40 SPACE SENSOR TR40 SPACE SENSOR TR40 SPACE SENSOR SYLK BUS 24 VAC CONTROLLER POWER LCBS CONTROLLER WALL MODULE RULES APPLY DEVICES WITH UP TO FOUR POWER UNITS ON SYLK BUS POWER UNITS TR40 SPACE TEMPERATURE SENSOR ONE 1 POWER UNIT TR40 H CO2 TEMPERATURE ...

Страница 43: ...LCBS CONNECT SOLUTION 43 31 00118EFS 01 ...

Страница 44: ...EFS 01 M S 02 17 Printed in United States By using this Honeywell literature you agree that Honeywell will have no liability for any damages arising out of your use or modification to the literature You will defend and indemnify Honeywell its affiliates and subsidiaries from and against any liability cost or damages including attorneys fees arising out of or resulting from any modification to the ...

Отзывы: