![Honeywell HON P095NG Series Скачать руководство пользователя страница 33](http://html.mh-extra.com/html/honeywell/hon-p095ng-series/hon-p095ng-series_user-and-maintenance-manual_150006033.webp)
Transport, installation and start‐up
User manual for HON R100 gas pressure regulator with HON P095NG pilot
33
Make sure that the following requirements are met before transportation:
You have seen and taken into account all instructions on the packaging regarding the
orientation of the packed device, the center of gravity, and attachment points.
The transport route is clear of obstacles and other barriers, and there is enough space
available for the dimensions of the packed device and the handling equipment. Make
sure to measure all of the package’s dimensions!
The transport route will be able to handle the load exerted by the total weight of the
handling equipment and the load being transported.
There is enough space for unpacking and installing the device at the installation loca‐
tion.
Proceed as follows:
Figure
Step
Description
1
Leave the transport panels (1) on the gas
pressure regulator during transport.
2
Rig the sling to the eye bolt (1).
3
Lift the gas pressure regulator.
Slowly and carefully transport the gas
pressure regulator to the location where it
will be installed.
Preparing for transporta‐
tion
Transporting the device