72
HC900 Process & Safety Controller User and Installation Manual
Revision 6
21 April 2017
Step
Procedure
Comments/References
3
Ensure that AC power to the
rack is disconnected.
Set co
ntroller module’s
communication ports to
desired settings (page 42).
Carefully place the Controller
Module in the rack,
immediately to the right of
the Power Supply. Fasten it
in place with two captured
screws at top and bottom.
Torque to 0,4-0,5 N.m
(3.5
– 4.4 Lb-In).
ATTENTION:
Do not install the battery at
this time. Installing the
battery(s) before the
controller is configured
can substantially shorten
battery life. Install under
power after the controller
configuration is complete.
(For more information, refer
to Battery
Installation/Replacement,
page 203.)
4
I/O will be installed later.
See Page 77.
Содержание HC900
Страница 5: ...Revision 6 HC900 Process Safety Controller User and Installation Manual v 21 April 2017 ...
Страница 6: ......
Страница 30: ......
Страница 128: ...114 HC900 Process Safety Controller User and Installation Manual Revision 6 21 April 2017 Figure 61 DC Output Jumpers ...
Страница 140: ......
Страница 186: ......
Страница 269: ...Revision 6 HC900 Process Safety Controller User and Installation Manual 255 21 April 2017 Declaration of Conformity ...
Страница 270: ...256 HC900 Process Safety Controller User and Installation Manual Revision 6 21 April 2017 ATEX Certification ...