Revision 6
HC900 Process & Safety Controller User and Installation Manual
237
21 April 2017
16 Point DC Digital Output
Step
Action
4
Connect field wiring.
Note: SDC+ in the wiring figure below refers to power that is disconnected from these screw terminals when
switch SW1 is open (0).
1
2
3
4
5
6
7
8
9
10 11 12 13 14 15 16 17 18 19 20
21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40
O
UT
1
O
UT
2
O
UT
3
O
UT
4
O
UT
5
O
UT
6
O
UT
7
O
UT
8
O
UT
9
O
UT
1
0
O
UT
1
1
O
UT
1
2
O
UT
1
3
O
UT
1
4
O
UT
1
5
O
UT
1
6
DC Supply
LOAD
LOAD
LOAD
LOAD
LOAD
LOAD
LOAD
LOAD
LOAD
LOAD
LOAD
LOAD
LOAD
LOAD
LOAD
LOAD
S
D
C
+
S
D
C
+
DC+
S
D
C
+
S
D
C
+
S
D
C
+
S
D
C
+
S
D
C
+
S
D
C
+
S
D
C
+
S
D
C
+
S
D
C
+
S
D
C
+
S
D
C
+
S
D
C
+
S
D
C
+
S
D
C
+
S
D
C
+
S
D
C
+
S
D
C
+
D
O1
-
D
O2
-
D
O9
-
D
O1
0
-
D
O5
-
D
O6
-
DC
-
D
O3
-
D
O4
-
D
O7
-
D
O8
-
S
D
C
+
S
D
C
+
DC
-
D
O1
1-
D
O1
2-
D
O1
3-
D
O1
4-
D
O1
5-
D
O1
6-
Install jumper wire
Note: DC Outputs provide electronic overload protection in the module, but adding a fuse (see picture)
protects the wiring.
Содержание HC900
Страница 5: ...Revision 6 HC900 Process Safety Controller User and Installation Manual v 21 April 2017 ...
Страница 6: ......
Страница 30: ......
Страница 128: ...114 HC900 Process Safety Controller User and Installation Manual Revision 6 21 April 2017 Figure 61 DC Output Jumpers ...
Страница 140: ......
Страница 186: ......
Страница 269: ...Revision 6 HC900 Process Safety Controller User and Installation Manual 255 21 April 2017 Declaration of Conformity ...
Страница 270: ...256 HC900 Process Safety Controller User and Installation Manual Revision 6 21 April 2017 ATEX Certification ...