68
HC900 Process & Safety Controller User and Installation Manual
Revision 6
21 April 2017
Mount Racks
Rack assembly information is given in Table 8.
Table 8
– Mount Racks
Step
Procedure
Comments/References
1
Mount the Rack in the
enclosure as follows.
Using the diagrams
below as a guide, mark
the locations for rack
mounting in the
enclosure for the top
holes in the rack.
(See CAUTION and
Note at right.)
Drill and tap for # 10 (or
M4) screws.
Start the mounting
screws (supplied by the
user) in the drilled
holes.
Hang the Rack on the
screws at the top.
Mark the locations for
the bottom screws.
(
See CAUTION at
right.)
Drill and tap for # 10 (or
M4) screws.
Remove the rack from
the enclosure.
For dimensions of the pattern for drilling holes, refer to the
diagram below.
When drilling holes, prevent metal
flakes from falling into the rack, or onto any surface within
the electrical cabinet.
Note: Always mount racks as shown above. That is, never
mount vertically, or with backplane horizontal.
Содержание HC900
Страница 5: ...Revision 6 HC900 Process Safety Controller User and Installation Manual v 21 April 2017 ...
Страница 6: ......
Страница 30: ......
Страница 128: ...114 HC900 Process Safety Controller User and Installation Manual Revision 6 21 April 2017 Figure 61 DC Output Jumpers ...
Страница 140: ......
Страница 186: ......
Страница 269: ...Revision 6 HC900 Process Safety Controller User and Installation Manual 255 21 April 2017 Declaration of Conformity ...
Страница 270: ...256 HC900 Process Safety Controller User and Installation Manual Revision 6 21 April 2017 ATEX Certification ...