198
HC900 Process & Safety Controller User and Installation Manual
Revision 6
21 April 2017
Step
Action
6.
Secure the lugs for AC wiring to the terminals on the new power supply.
L1 (top terminal) - Black (USA) or Brown (Europe)
L2 /N (middle terminal - White (USA) or Blue (Europe).
Ground (bottom terminal)
7.
Ensure power can be applied safely, and use the external (user-supplied) switch to re-connect
power to the power supply.
8.
Using a meter and the test points on the face of the power supply, ensure that voltages (measured
on the backplane) are within specifications.
Содержание HC900
Страница 5: ...Revision 6 HC900 Process Safety Controller User and Installation Manual v 21 April 2017 ...
Страница 6: ......
Страница 30: ......
Страница 128: ...114 HC900 Process Safety Controller User and Installation Manual Revision 6 21 April 2017 Figure 61 DC Output Jumpers ...
Страница 140: ......
Страница 186: ......
Страница 269: ...Revision 6 HC900 Process Safety Controller User and Installation Manual 255 21 April 2017 Declaration of Conformity ...
Страница 270: ...256 HC900 Process Safety Controller User and Installation Manual Revision 6 21 April 2017 ATEX Certification ...