GUARANTEE
HOLZMANN Maschinen Austria
www.holzmann-maschinen.at
Seite 12
Metalldrehbank/Metal turning lathe ED1000F
vices.
Pump with CSA/US application, a reciprocating fuse is included, power will be automatical-
ly cut off when abnormal situation occur, .re-check if all installation procedures are cor-
rect. Pump will resume operation after 3~4 hours after power been cut off..
Fig 5 Fig6
10
START-UP
Before start the pump, please check the following items:
1)
Check if enter power wires are fastened securely as per circuit diagram. If are not fastened
securely, pump may burn down or occur other hazard cause by running lack of phase. We
will not be responsible for after sale services.
2)
Check whether three phase pump is rotating correctly. The rotating direction should be
clockwise, same as the arrow direction marked on the fan cover. (As shown in fig. 5 and 6)
3)
Piping and connectors should be installed tightly to prevent liquid leaking. The strength to
tighten the discharge connector should be proper; otherwise; crack may occur in the thread
hole and cause pump damage. We will not assure after sale services.
4)
Tank must be filled in with liquid to proper level and no higher than
5)
the height of the bolts of the body stand. Otherwise, liquid might get into coil and cause
power leakage. (As showed in Fig. 7)
The highest liquid level
The deepest liquid level
F
i
g
7
A
R
R
O
W
D
I
R
E
C
T
I
O
N
Содержание KMP 13
Страница 18: ......