![Hohner UNIVERSAL 52/8 S Скачать руководство пользователя страница 6](http://html1.mh-extra.com/html/hohner/universal-52-8-s/universal-52-8-s_operating-instructions-spare-parts-list-special-staples-options_2144679006.webp)
Safety Information
HK 52/8 S
Hohner Maschinenbau GmbH
6
1 Safety Information
1.1 Purpose of this document
This document will inform the operator of the
Stitching Head 52/8 S
of the following:
•
The safety symbols and signs
•
The packing of the machine and its transportation
•
The function and operation of the machine
•
Commissioning the machine
•
The elimination of faults which arise
•
Servicing
Familiarity with this Operating Manual is thus a prerequisite for the safe and correct operation of
the stitching head. It must be read carefully by the operator before the machine is commissioned.
Keep the manual safely in a place where it is readily available and which is close to hand for
persons working on the machine.
1.2 The
operator
The
Stitching Head 52/8 S
must only be operated by trained personnel.
Training will be undertaken by the manufacturer or by persons who have been authorised by the
manufacturer to undertake such training.
1.3 Safety symbols and the displays that have been used
This symbol indicates immediate danger to the life or health of
persons in the immediate vicinity of the machine.
Non-observance of dangers which are so indicated can have grave
consequences and can cause serious damage to health, or may even to
lead to deaths.
This symbol indicates that a potentially dangerous situation has
arisen.
Non-observance of dangers which are so indicated can lead to slight injuries
to persons or damage to equipment.
This symbol indicates that tips on how to use the machine or
particularly useful information are available.
These will help you to use all of the functions of the machine in an optimal
manner.
-
This symbol requires you to take action.
•
This sign serves as a symbol for listing items.
Содержание UNIVERSAL 52/8 S
Страница 2: ...HK 52 8 S Hohner Maschinenbau GmbH 2...
Страница 9: ...Safety Information Hohner Maschinenbau GmbH HK 52 8 S 9...
Страница 16: ...Operation HK 52 8 S Hohner Maschinenbau GmbH 16 3 Operation Fig 5 Middle of Staple Fig 4...
Страница 18: ...Operation HK 52 8 S Hohner Maschinenbau GmbH 18 Fig 6...
Страница 20: ...Operation HK 52 8 S Hohner Maschinenbau GmbH 20 Fig 7...
Страница 22: ...Operation HK 52 8 S Hohner Maschinenbau GmbH 22 Fig 8...
Страница 24: ...Operation HK 52 8 S Hohner Maschinenbau GmbH 24 Fig 9...
Страница 26: ...Operation HK 52 8 S Hohner Maschinenbau GmbH 26 Fig 10...
Страница 28: ...Operation HK 52 8 S Hohner Maschinenbau GmbH 28 Fig 11...
Страница 30: ...Operation HK 52 8 S Hohner Maschinenbau GmbH 30 Fig 12a Fig 12b...
Страница 32: ...Operation HK 52 8 S Hohner Maschinenbau GmbH 32 Fig 14 Fig 15 View X A A B A A B Fig 13...
Страница 34: ...Operation HK 52 8 S Hohner Maschinenbau GmbH 34 Fig 16 Fig 17...
Страница 40: ...Operation HK 52 8 S Hohner Maschinenbau GmbH 40 Fig 21...
Страница 42: ...Servicing HK 52 8 S Hohner Maschinenbau GmbH 42 4 Servicing Fig 22...
Страница 44: ...Servicing HK 52 8 S Hohner Maschinenbau GmbH 44 4 2 Installation and replacement of parts Fig 23 Fig 24...
Страница 46: ...Servicing HK 52 8 S Hohner Maschinenbau GmbH 46 Fig 25 Fig 26 Fig 27 A...
Страница 48: ...Servicing HK 52 8 S Hohner Maschinenbau GmbH 48 Fig 28...
Страница 50: ...Servicing HK 52 8 S Hohner Maschinenbau GmbH 50 Fig 29 Fig 30 Fig 31 Fig 32 Fig 33 A B...
Страница 52: ...Servicing HK 52 8 S Hohner Maschinenbau GmbH 52 Fig 34...