![Hohner UNIVERSAL 52/8 S Скачать руководство пользователя страница 27](http://html1.mh-extra.com/html/hohner/universal-52-8-s/universal-52-8-s_operating-instructions-spare-parts-list-special-staples-options_2144679027.webp)
Operation
Hohner Maschinenbau GmbH
HK 52/8 S
27
3.5 Straighten the stitching wire
- Fig. 10
The stitching wire must run absolutely straight out of the circular knife. The wire feed can be set to
run absolutely straight by turning the wire alignment roller
which is arranged on eccentric
bearings.
Wire straightening procedure:
- First remove former. (cf. 4.2.1)
a) Activate the machine's jog switch if possible.
b) Manual wire feed (cf. 3.2 Feeding the stitching wire)
Wire can be fed by turning the provided adjusting handle in the clockwise direction. When
doing this, it is a good idea to cut off any overlong pieces of wire, by pressing down the knife
slider
(possible by “levering” the rocker
).
- Turn eccentric fixing of the wire alignment roller
with the screwdriver until the stitching wire
runs absolutely straight out of the circular knife.
Содержание UNIVERSAL 52/8 S
Страница 2: ...HK 52 8 S Hohner Maschinenbau GmbH 2...
Страница 9: ...Safety Information Hohner Maschinenbau GmbH HK 52 8 S 9...
Страница 16: ...Operation HK 52 8 S Hohner Maschinenbau GmbH 16 3 Operation Fig 5 Middle of Staple Fig 4...
Страница 18: ...Operation HK 52 8 S Hohner Maschinenbau GmbH 18 Fig 6...
Страница 20: ...Operation HK 52 8 S Hohner Maschinenbau GmbH 20 Fig 7...
Страница 22: ...Operation HK 52 8 S Hohner Maschinenbau GmbH 22 Fig 8...
Страница 24: ...Operation HK 52 8 S Hohner Maschinenbau GmbH 24 Fig 9...
Страница 26: ...Operation HK 52 8 S Hohner Maschinenbau GmbH 26 Fig 10...
Страница 28: ...Operation HK 52 8 S Hohner Maschinenbau GmbH 28 Fig 11...
Страница 30: ...Operation HK 52 8 S Hohner Maschinenbau GmbH 30 Fig 12a Fig 12b...
Страница 32: ...Operation HK 52 8 S Hohner Maschinenbau GmbH 32 Fig 14 Fig 15 View X A A B A A B Fig 13...
Страница 34: ...Operation HK 52 8 S Hohner Maschinenbau GmbH 34 Fig 16 Fig 17...
Страница 40: ...Operation HK 52 8 S Hohner Maschinenbau GmbH 40 Fig 21...
Страница 42: ...Servicing HK 52 8 S Hohner Maschinenbau GmbH 42 4 Servicing Fig 22...
Страница 44: ...Servicing HK 52 8 S Hohner Maschinenbau GmbH 44 4 2 Installation and replacement of parts Fig 23 Fig 24...
Страница 46: ...Servicing HK 52 8 S Hohner Maschinenbau GmbH 46 Fig 25 Fig 26 Fig 27 A...
Страница 48: ...Servicing HK 52 8 S Hohner Maschinenbau GmbH 48 Fig 28...
Страница 50: ...Servicing HK 52 8 S Hohner Maschinenbau GmbH 50 Fig 29 Fig 30 Fig 31 Fig 32 Fig 33 A B...
Страница 52: ...Servicing HK 52 8 S Hohner Maschinenbau GmbH 52 Fig 34...