![Hohner UNIVERSAL 52/8 S Скачать руководство пользователя страница 37](http://html1.mh-extra.com/html/hohner/universal-52-8-s/universal-52-8-s_operating-instructions-spare-parts-list-special-staples-options_2144679037.webp)
Operation
Hohner Maschinenbau GmbH
HK 52/8 S
37
3.9 Spine
centering
parts
The spine centering parts are only used for saddle stitching. They help to precisely position the
stitch
in the center of the sheet fold
(cf. Fig. 17)
3.9.1 Fitting the holding down device
- Fig. 19 -
- Put centering device rods
with carrier
between distance plate
and guide plate
(plates
and rods should be slightly lubricated).
- Screw in screws
through the plate holes in the thread on the housing and tighten screw; the
rods
should be parallel with the housing edge.
Proper setting of the carrier
is required to ensure correct functioning of the centering device.
The two adjusting nuts
can be turned uniformly (same gap widths between both plates) with the
open-end wrench
.
The adjusting nuts
are tightened clockwise so that the centering device rods
can just be
pushed upward and downward with two fingers (pushing force 15-20N).
Rods and guide plates should be slightly lubricated and the adjusting nuts be retightened
(if
necessary) from time to time.
- A too strong setting causes higher wear of the functional components and markings on the
stitching material.
- If the setting is too light the centering device might drop and block the stitching material.
When installing the stitching head with centering device (- Fig. 19b -) make sure that the carrier
is correctly placed in the groove of the drive beam
(view “X”).
3.9.2 Fitting the slide
- Fig. 19a -
- Attach slide
with holding plate
by means of nuts or screws
to the clincher box.
- Loosen clamping screw
.
- Move slide
in the oblong hole and set the height of the slide prism
to approx. 0.5 mm above
the clincher box.
- Tighten clamping screw
.
3.9.3 Setting the centering prism
- Fig. 19a -
The centering prism
can be shifted to the front or rear by turning the check screw
.
- Shift the centering prism
until it is aligned with the slide prism
.
- Correct if necessary after having carried out test stitches.
Содержание UNIVERSAL 52/8 S
Страница 2: ...HK 52 8 S Hohner Maschinenbau GmbH 2...
Страница 9: ...Safety Information Hohner Maschinenbau GmbH HK 52 8 S 9...
Страница 16: ...Operation HK 52 8 S Hohner Maschinenbau GmbH 16 3 Operation Fig 5 Middle of Staple Fig 4...
Страница 18: ...Operation HK 52 8 S Hohner Maschinenbau GmbH 18 Fig 6...
Страница 20: ...Operation HK 52 8 S Hohner Maschinenbau GmbH 20 Fig 7...
Страница 22: ...Operation HK 52 8 S Hohner Maschinenbau GmbH 22 Fig 8...
Страница 24: ...Operation HK 52 8 S Hohner Maschinenbau GmbH 24 Fig 9...
Страница 26: ...Operation HK 52 8 S Hohner Maschinenbau GmbH 26 Fig 10...
Страница 28: ...Operation HK 52 8 S Hohner Maschinenbau GmbH 28 Fig 11...
Страница 30: ...Operation HK 52 8 S Hohner Maschinenbau GmbH 30 Fig 12a Fig 12b...
Страница 32: ...Operation HK 52 8 S Hohner Maschinenbau GmbH 32 Fig 14 Fig 15 View X A A B A A B Fig 13...
Страница 34: ...Operation HK 52 8 S Hohner Maschinenbau GmbH 34 Fig 16 Fig 17...
Страница 40: ...Operation HK 52 8 S Hohner Maschinenbau GmbH 40 Fig 21...
Страница 42: ...Servicing HK 52 8 S Hohner Maschinenbau GmbH 42 4 Servicing Fig 22...
Страница 44: ...Servicing HK 52 8 S Hohner Maschinenbau GmbH 44 4 2 Installation and replacement of parts Fig 23 Fig 24...
Страница 46: ...Servicing HK 52 8 S Hohner Maschinenbau GmbH 46 Fig 25 Fig 26 Fig 27 A...
Страница 48: ...Servicing HK 52 8 S Hohner Maschinenbau GmbH 48 Fig 28...
Страница 50: ...Servicing HK 52 8 S Hohner Maschinenbau GmbH 50 Fig 29 Fig 30 Fig 31 Fig 32 Fig 33 A B...
Страница 52: ...Servicing HK 52 8 S Hohner Maschinenbau GmbH 52 Fig 34...