Faults
Hohner Maschinenbau GmbH
HK 52/8 S
55
Stitch legs break
off:
Hump at a stitch
corner:
Stitch legs
contract or
diverge:
Leg ends clinched
the wrong way
round:
One or both legs
are clinched
obliquely:
Stitch legs are
clinched obliquely
to the same side:
Lightly bent wire
pieces fall out:
Wire loop between
conveyor wheels
and wire guidance
tube:
Straight wire
pieces fall out:
Remedy for faults:
loop stitching
- Wire too brittle: use a different wire quality.
- Former blocked by pieces of wire: remove wire
pieces, remove former if necessary.
- Gripper spring or gripper in former defective.
- Wire thickness not suitable for the wire guiding
parts (bender and driver).
- Adjust former to bender groove.
- Weak or soft wire.
- Driver damaged, cf. 4.2.3.
- Circular or flat knife worn, cf. 4.2.4.
- Wire not aligned, cf. 3.5.
- Circular or flat knife worn, cf. 4.2.4.
- Wire not aligned, cf. 3.5.
- Align clincher box, cf. 3.1.4.
- Weak or soft wire.
- Wire not aligned, cf. 3.5.
- Circular or flat knife worn, cf. 4.2.4.
- Clincher damaged, cf. 3.1.3.
- Adjustment of clincher box mounting to stitching
head mounting, cf. 3.1.4.
- Wire not aligned, cf. 3.5.
- Adjustment of clincher box mounting to stitching
head mounting, cf. 3.1.4.
- Wire not aligned, cf. 3.5.
- Bender worn, cf. 4.2.2.
- Wire not aligned, cf. 3.5.
- Cutting slider jammed: circular knife set too
tightly to flat knife, cf. 4.2.4.3.
- Cutting rocker locked, pressure spring in cutting
block defective.
- Former incorrectly set, cf. 4.2.1.
- Cutting pusher gets caught:
- compression spring faulty
- knife set too strong
- bottom wire guides clogged
- Weak spring pressure on former.
- Wire not aligned, cf. 3.5.
- Former set incorrectly, cf. 4.2.1.
You will find most faults and their causes in the
preceding section.
Содержание UNIVERSAL 52/8 S
Страница 2: ...HK 52 8 S Hohner Maschinenbau GmbH 2...
Страница 9: ...Safety Information Hohner Maschinenbau GmbH HK 52 8 S 9...
Страница 16: ...Operation HK 52 8 S Hohner Maschinenbau GmbH 16 3 Operation Fig 5 Middle of Staple Fig 4...
Страница 18: ...Operation HK 52 8 S Hohner Maschinenbau GmbH 18 Fig 6...
Страница 20: ...Operation HK 52 8 S Hohner Maschinenbau GmbH 20 Fig 7...
Страница 22: ...Operation HK 52 8 S Hohner Maschinenbau GmbH 22 Fig 8...
Страница 24: ...Operation HK 52 8 S Hohner Maschinenbau GmbH 24 Fig 9...
Страница 26: ...Operation HK 52 8 S Hohner Maschinenbau GmbH 26 Fig 10...
Страница 28: ...Operation HK 52 8 S Hohner Maschinenbau GmbH 28 Fig 11...
Страница 30: ...Operation HK 52 8 S Hohner Maschinenbau GmbH 30 Fig 12a Fig 12b...
Страница 32: ...Operation HK 52 8 S Hohner Maschinenbau GmbH 32 Fig 14 Fig 15 View X A A B A A B Fig 13...
Страница 34: ...Operation HK 52 8 S Hohner Maschinenbau GmbH 34 Fig 16 Fig 17...
Страница 40: ...Operation HK 52 8 S Hohner Maschinenbau GmbH 40 Fig 21...
Страница 42: ...Servicing HK 52 8 S Hohner Maschinenbau GmbH 42 4 Servicing Fig 22...
Страница 44: ...Servicing HK 52 8 S Hohner Maschinenbau GmbH 44 4 2 Installation and replacement of parts Fig 23 Fig 24...
Страница 46: ...Servicing HK 52 8 S Hohner Maschinenbau GmbH 46 Fig 25 Fig 26 Fig 27 A...
Страница 48: ...Servicing HK 52 8 S Hohner Maschinenbau GmbH 48 Fig 28...
Страница 50: ...Servicing HK 52 8 S Hohner Maschinenbau GmbH 50 Fig 29 Fig 30 Fig 31 Fig 32 Fig 33 A B...
Страница 52: ...Servicing HK 52 8 S Hohner Maschinenbau GmbH 52 Fig 34...