Operation
Hohner Maschinenbau GmbH
HK 52/8 S
31
3.6.3 Setting the leg length of the stitch
- Fig. 12a, Fig. 12b -
After having set the wire length the leg length of the staple must be adjusted. Set the stitching unit
to 2-sheet stitching.
- Undo the Torx screw
.
- Shift the adjustment rods
by adjusting the adjustment lever
. Both the staple legs must be of
equal length.
- Tighten the Torx screw
.
Test the leg length by a test stitch. Repeat procedure if a correction is necessary.
Normal stitch
set higher value
set lower value
Loop stitch
set higher value
set lower value
3.6.4 Manual adjustment of the leg length (without central adjustment)
- Fig. 12a, Fig. 12b -
After having set the wire length the leg length of the staple must be adjusted. Both the staple legs
must be of equal length. The leg length of the staple depends on the stitch thickness of the
material to be stitched. Adjust the knives box
by adjusting the adjustment lever
in order to
adapt the leg length to the material to be stitched. The notch at the scale pin
marks the set
value of the stitch thickness in mm for normal staples.
The end of the scale pin
marks the set value of the stitch thickness in mm for loop-stitching
clamps (-L6-).
Содержание UNIVERSAL 52/8 S
Страница 2: ...HK 52 8 S Hohner Maschinenbau GmbH 2...
Страница 9: ...Safety Information Hohner Maschinenbau GmbH HK 52 8 S 9...
Страница 16: ...Operation HK 52 8 S Hohner Maschinenbau GmbH 16 3 Operation Fig 5 Middle of Staple Fig 4...
Страница 18: ...Operation HK 52 8 S Hohner Maschinenbau GmbH 18 Fig 6...
Страница 20: ...Operation HK 52 8 S Hohner Maschinenbau GmbH 20 Fig 7...
Страница 22: ...Operation HK 52 8 S Hohner Maschinenbau GmbH 22 Fig 8...
Страница 24: ...Operation HK 52 8 S Hohner Maschinenbau GmbH 24 Fig 9...
Страница 26: ...Operation HK 52 8 S Hohner Maschinenbau GmbH 26 Fig 10...
Страница 28: ...Operation HK 52 8 S Hohner Maschinenbau GmbH 28 Fig 11...
Страница 30: ...Operation HK 52 8 S Hohner Maschinenbau GmbH 30 Fig 12a Fig 12b...
Страница 32: ...Operation HK 52 8 S Hohner Maschinenbau GmbH 32 Fig 14 Fig 15 View X A A B A A B Fig 13...
Страница 34: ...Operation HK 52 8 S Hohner Maschinenbau GmbH 34 Fig 16 Fig 17...
Страница 40: ...Operation HK 52 8 S Hohner Maschinenbau GmbH 40 Fig 21...
Страница 42: ...Servicing HK 52 8 S Hohner Maschinenbau GmbH 42 4 Servicing Fig 22...
Страница 44: ...Servicing HK 52 8 S Hohner Maschinenbau GmbH 44 4 2 Installation and replacement of parts Fig 23 Fig 24...
Страница 46: ...Servicing HK 52 8 S Hohner Maschinenbau GmbH 46 Fig 25 Fig 26 Fig 27 A...
Страница 48: ...Servicing HK 52 8 S Hohner Maschinenbau GmbH 48 Fig 28...
Страница 50: ...Servicing HK 52 8 S Hohner Maschinenbau GmbH 50 Fig 29 Fig 30 Fig 31 Fig 32 Fig 33 A B...
Страница 52: ...Servicing HK 52 8 S Hohner Maschinenbau GmbH 52 Fig 34...