Operation
Hohner Maschinenbau GmbH
HK 52/8 S
25
3.2 Feeding the stitching wire
- Fig. 9 -
- Shut off the wire transport (move triangular handle
in the "centre position").
- Push the stitching wire through from above, as follows:
through the eyes
of the wire guide - between the two felt disks
through into the wire return
lock
- through the wire guidance tube
and between the two feed wheels
.
- Restart the wire transport (turn triangular handle
to the left or to the right).
- Mount adjusting handle
.
- Convey the wire to the knife by turning the adjusting handle
to the left (clockwise).
3.3 Removing the stitching wire
- Shut off the wire transport (move triangular handle
in the "centre position").
- Press adjusting disk
on wire return lock downwards, in order to eliminate its clamping effect,
and pull the wire out.
3.4 Removing the wire guide tubes in the event of a wire jam
If a wire jam has occurred in the area of the wire guide tubes, this can be eliminated more easily
by removing the wire guide tube.
- Shut off the wire transport (move triangular handle
in the "centre position").
- Loosen the clamping screw
(Torx screw) and remove wire guide tube
- Disentangle wire and remove from wire guide tubes.
- Press adjusting disk
on wire return lock downwards in order to eliminate its clamping effect
and pull wire out.
Содержание UNIVERSAL 52/8 S
Страница 2: ...HK 52 8 S Hohner Maschinenbau GmbH 2...
Страница 9: ...Safety Information Hohner Maschinenbau GmbH HK 52 8 S 9...
Страница 16: ...Operation HK 52 8 S Hohner Maschinenbau GmbH 16 3 Operation Fig 5 Middle of Staple Fig 4...
Страница 18: ...Operation HK 52 8 S Hohner Maschinenbau GmbH 18 Fig 6...
Страница 20: ...Operation HK 52 8 S Hohner Maschinenbau GmbH 20 Fig 7...
Страница 22: ...Operation HK 52 8 S Hohner Maschinenbau GmbH 22 Fig 8...
Страница 24: ...Operation HK 52 8 S Hohner Maschinenbau GmbH 24 Fig 9...
Страница 26: ...Operation HK 52 8 S Hohner Maschinenbau GmbH 26 Fig 10...
Страница 28: ...Operation HK 52 8 S Hohner Maschinenbau GmbH 28 Fig 11...
Страница 30: ...Operation HK 52 8 S Hohner Maschinenbau GmbH 30 Fig 12a Fig 12b...
Страница 32: ...Operation HK 52 8 S Hohner Maschinenbau GmbH 32 Fig 14 Fig 15 View X A A B A A B Fig 13...
Страница 34: ...Operation HK 52 8 S Hohner Maschinenbau GmbH 34 Fig 16 Fig 17...
Страница 40: ...Operation HK 52 8 S Hohner Maschinenbau GmbH 40 Fig 21...
Страница 42: ...Servicing HK 52 8 S Hohner Maschinenbau GmbH 42 4 Servicing Fig 22...
Страница 44: ...Servicing HK 52 8 S Hohner Maschinenbau GmbH 44 4 2 Installation and replacement of parts Fig 23 Fig 24...
Страница 46: ...Servicing HK 52 8 S Hohner Maschinenbau GmbH 46 Fig 25 Fig 26 Fig 27 A...
Страница 48: ...Servicing HK 52 8 S Hohner Maschinenbau GmbH 48 Fig 28...
Страница 50: ...Servicing HK 52 8 S Hohner Maschinenbau GmbH 50 Fig 29 Fig 30 Fig 31 Fig 32 Fig 33 A B...
Страница 52: ...Servicing HK 52 8 S Hohner Maschinenbau GmbH 52 Fig 34...