13 of 44
7.4
CABLE
INSTALLATION
Locate
cables
and
set
out
on
the
floor.
Check
the
part
numbers
located
on
each
stud
of
each
cable.
CABLE
#1...........PART
#2
‐
0643
(318”LG.
‐
L.F.)
CABLE
#2...........PART
#2
‐
0644
(151”LG.
‐
L.R.)
CABLE
#3...........PART
#2
‐
0645
(203”LG.
‐
R.R.)
CABLE
#4...........PART
#2
‐
0646
(367”LG.
‐
R.F.)
NOTE:
THE
PULLEYS
(SHEAVES)
ON
THE
CROSSMEMBERS
DO
NOT
HAVE
TO
BE
REMOVED
FOR
CABLE
INSTALLATION.
A
3/8”
‐
16
UNC
2
3/4”
LG.
HEX
HEAD
BOLT
MUST
BE
REMOVED
FROM
THE
CROSSMEMBERS
TO
ALLOW
CABLE
INSTALLATION
AROUND
THE
PULLEYS.
THIS
3/8”
‐
16
UNC
2
3/4”
LG.
HEX
HEAD
BOLT
MUST
BE
REINSTALLED
AFTER
THE
CABLES
ARE
ROUTED
THROUGH
THE
CROSSMEMBER
ASSEMBLIES.
WARNING!!!
DO
NOT
APPLY
LUBRICANT
TO
SHEAVE
ASSEMBLY.
FIBRE
BUSHING
IS
PTFE
SELF
‐
LUBRICATING.
THE
ADDITION
OF
LUBRICANT
WILL
SHORTEN
THE
LIFE
OF
THE
FIBRE
BUSHING.
Before
beginning
cable
routing,
refer
to
Figure
4
Cable
and
Routing
Diagram.
Begin
routing
cable
#4
(part
#2
‐
0646)
from
the
right
side
of
the
front
crossmember
assembly
using
the
non
threaded
end
of
the
cable
as
described
in
Figure
4,
and
out
through
the
opening
under
the
front
of
the
right
deck.
CHECK
FOR
CORRECT
ARRANGEMENT
OF
SPACERS
ON
SHEAVE
STACKS,
FIGURE
5.
Install
the
sheave
into
the
front
of
the
right
deck
as
shown
in
Figure
5.
NOTE:
MAKE
CERTAIN
THAT
THE
CABLE
RUNS
BETWEEN
THE
WELDED
GUIDE
PIN
AND
THE
GROOVE
IN
THE
PULLEY.
SHEAVE
STACK
Figure
6
NOTE:
Typical
deck
sheave
arrangement.
Left
and
right
front
deck
shown;
cable
must
run
between
the
welded
guide
pin
and
the
groove
in
the
sheave.
Left
and
right
front
spacers
have
equal
top
and
bottom
sizes.
Содержание FPA12144
Страница 8: ...8 of 44 6 0 GENERAL LIFT SPECIFICATIONS Figure 1 ...
Страница 12: ...12 of 44 7 3 SHEAVE INSTALLATION Figure 5 ...
Страница 34: ...34 of 44 9 0 LIFT ASSEMBLY ...
Страница 37: ...10 0 HYDRAULIC AND A AIR KITS AS 37 of 44 SSEMBLY ...
Страница 39: ...11 0 CABLE RO OUTING DIAGRAM 39 of 44 ...
Страница 42: ...13 0 POWER P PACK 6 1 1936 AB 1 42 of 44 1400 208 2 230V 1PH 60HZ ...