22 of 44
ANCHOR
INSTALLATION
Tighten
all
anchor
bolts
to
a
torque
of
55
ft.
lbs.
Recheck
and
adjust
the
level
of
post(s)
and
cable(s)
if
necessary.
NOTE:
IN
CASES
WHERE
THE
FLOOR
IS
EXTREMELY
OUT
OF
LEVEL,
THE
MECHANICAL
SAFETIES
MAY
NOT
ENGAGE
ON
THE
SAME
LOCK.
NOTE:
THE 1/2”
4 ½” LG. WEDGE ANCHOR BOLTS SUPPLIED MUST HAVE A
MINIMUM EMBEDMENT OF 2” INTO CONCRETE FLOOR.
NOTE: IN CASES WHERE THE FLOOR IS EXTREMELY OUT OF LEVEL, THE
MECHANICAL SAFETIES MAY NOT ENGAGE ON THE SAME LOCK.
Содержание FPA12144
Страница 8: ...8 of 44 6 0 GENERAL LIFT SPECIFICATIONS Figure 1 ...
Страница 12: ...12 of 44 7 3 SHEAVE INSTALLATION Figure 5 ...
Страница 34: ...34 of 44 9 0 LIFT ASSEMBLY ...
Страница 37: ...10 0 HYDRAULIC AND A AIR KITS AS 37 of 44 SSEMBLY ...
Страница 39: ...11 0 CABLE RO OUTING DIAGRAM 39 of 44 ...
Страница 42: ...13 0 POWER P PACK 6 1 1936 AB 1 42 of 44 1400 208 2 230V 1PH 60HZ ...