29 of 44
Wire
rope
tension
adjustment
should
be
performed
when
installing
the
lift
and
every
three
months
.
8.2.6
INSPECT
CABLE
FLANGE
Make
sure
the
edges
of
the
counter
‐
bores
in
the
cable
flange
are
not
damaged
or
worn,
indicating
that
cable
sleeves
may
not
be
properly
seated
at
all
times.
8.3
FASTENERS
Check
all
the
attaching
bolts
and
nuts
for
tightness.
Note:
Air
cylinder
bolts
and
nuts
should
allow
movement
of
the
cylinder.
8.4
SHEAVES
AND
PINS
Sheaves
and
pins
are
expendable
items.
Sheaves
and
pins
should
be
replaced
when
worn.
Use
of
sheaves
and
pins
with
excessive
wear
will
lead
to
reduced
service
life
of
the
cables.
Bushings
inside
sheaves
work
best
in
“dry”
condition.
Applying
oil
will
diminish
their
performance
and
greases
will
degrade
performance
even
further.
DO
NOT
GREASE
SHEAVE
BUSHINGS
OR
SHAFTS.
8.4.1
VISUAL
INSPECTION
OF
SHEAVES
Check
sheaves
and
replace
if
cracks
or
other
damage
are
found.
Visually
inspect
alignment
of
sheaves.
Misalignment
of
sheaves
indicates
excessive
wear.
Remove,
inspect,
and,
if
needed
replace
sheave
and
pin.
8.4.2
MEASURE
SHEAVE
WEAR
Inspect
sheaves
in
cross
‐
members
with
lift
in
lowered
position
and
resting
on
safety
latches
Place
safety
stands
under
front
and
rear
cross
‐
members.
Stop
lift
on
mechanical
safety
locks.
One
person
should
hold
the
lowering
handle
on
power
unit
down
while
another
person
pulls
on
cables
in
each
column
to
create
slack
in
cables.
Check
for
ease
of
rotation.
If
sheaves
do
not
turn
freely,
the
sheave
and
sheave
pin
should
be
removed,
inspected,
fixed
or
replaced.
Fully
raise
the
lift,
to
inspect
sheaves
in
runways.
Hold
lowering
handle
down
to
lower
lift
onto
safety
latches
Pull
on
cables
in
runway
to
create
slack
in
cables.
Check
all
sheaves
for
excessive
wobble,
or
movement.
Grasp
rim
of
sheave
and
attempt
to
wobble
(tilt)
side
to
side.
If
sheaves
wobble
(tilt)
more
than
3/16”
(1.6
mm)
side
to
Содержание FPA12144
Страница 8: ...8 of 44 6 0 GENERAL LIFT SPECIFICATIONS Figure 1 ...
Страница 12: ...12 of 44 7 3 SHEAVE INSTALLATION Figure 5 ...
Страница 34: ...34 of 44 9 0 LIFT ASSEMBLY ...
Страница 37: ...10 0 HYDRAULIC AND A AIR KITS AS 37 of 44 SSEMBLY ...
Страница 39: ...11 0 CABLE RO OUTING DIAGRAM 39 of 44 ...
Страница 42: ...13 0 POWER P PACK 6 1 1936 AB 1 42 of 44 1400 208 2 230V 1PH 60HZ ...