Power on and NETWORK READY
1. After setup of NET ID and connecting cables, turn on each DSR.
For the master unit, please wait until the LCD displays the following messages.
NETWORK CHECK 02
PRESS
Number of slave unit connected
In this case, two slave units are connected.
NETWORK CHECK 02
YES TO START
For all slave unit (s), please wait until the LCD displays the following messages.
2. Press the YES button of master unit.
Main screen is displayed.
NET SLAVE: 0X
NETWORK READY
COPY START?
(DVDtoDVD)
Displaying the same number as the NET
ID.
* If the main screen above is not displayed, please press the YES button a few times.
51