SAFETY
S-10
Investigate Job Site Beforehand
When working at the edge of an excavation or on a road
shoulder, the machine could tip over, possibly resulting in
serious injury or death.
Investigate the configuration and ground conditions of
the job site beforehand to prevent the machine from
falling and to prevent the ground, stockpiles, or banks
from collapsing.
Make a work plan. Use machines appropriate to the work
and job site.
Reinforce ground, edges, and road shoulders as
necessary. Keep the machine well back from the edges of
excavations and road shoulders.
When working on an incline or on a road shoulder,
employ a signal person as required.
Confirm that your machine is equipped with a FOPS cab
before working in areas where the possibility of falling
stones or debris exist.
When the ground footing is weak, reinforce the ground
before starting work.
When working on frozen ground, be extremely alert. As
ambient temperatures rise, the ground footing becomes
loose and slippery.
Beware of the possibility of fire when operating the
machine near flammable objects such as dry grass.
SA-447
Содержание ZW 310-6
Страница 4: ......
Страница 10: ...CONTENTS MEMO ...
Страница 14: ...INTENDED USE 2 MEMO ...
Страница 57: ...SAFETY SIGNS S 43 ZW310 6 SS 3777 2 ...
Страница 59: ...SAFETY SIGNS S 45 ZW330 6 92Z7B S 40EU ...
Страница 203: ...OPERATOR S STATION 1 137 Coat Hook Use to hang your coat hat etc MNEC 01 518 MNEC 01 053 ZW310 6 ZW330 6 ...
Страница 246: ...BREAK IN 2 2 MEMO ...
Страница 280: ...DRIVING MACHINE 4 20 MEMO ...
Страница 460: ...MAINTENANCE 7 146 MEMO ...
Страница 464: ...MAINTENANCE UNDER SPECIAL ENVIRONMENTAL CONDITIONS 9 4 MEMO ...
Страница 468: ...STORAGE 10 4 MEMO ...
Страница 474: ...TROUBLESHOOTING 11 6 MEMO ...
Страница 498: ...INDEX 14 6 MEMO ...
Страница 502: ...CONFORMITY MEMO ...
Страница 506: ......