OPTIONAL ATTACHMENTS AND DEVICES
13-19
MAINTENANCE
Refer to the Greasing Front Joint Pins pages in the MAINTE-
NANCE section.
Boom Foot, Boom Cylinder Bottom Side, Arm Cylinder
Rod Side, and Bucket Cylinder Bottom Side Pins:
--- every 500 hours
Refer to the Greasing Front Joint Pins pages in the MAINTE-
NANCE section.
Offset Front Attachment Joint Pins
Greasing Fittings Other Than Illustrated:
--- every 250 hours
Add greasing to all illustrated grease fittings.
Offset Cylinder Bottom and Rod End Stay
--- every 500 hours
Arm Cylinder Bottom and Rod End.
Bucket Cylinder Bottom End
Arm Joint Pin
--- every 500 hours
Lower Boom and Upper Boom Joint Pin.
Upper Boom and Stay Cylinder Joint Pin.
--- every 250 hours
M175-13-006
M175-13-007
M175-13-008
Содержание ZAXIS 120-3 class
Страница 1: ......
Страница 3: ......
Страница 5: ......
Страница 49: ...SAFETY SIGNS Europe Asia Middle and Near East Model Only S 38 MEMO ...
Страница 131: ...BREAK IN 2 MEMO ...
Страница 191: ...TRANSPORTING 6 MEMO ...
Страница 290: ...HYDRAULIC CIRCUIT AND ELECTRICAL CIRCUIT 8 HYDRAULIC CIRCUIT M1V1 08 001 ...
Страница 292: ...8 ELECTRICAL DIAGRAM ...
Страница 293: ...HYDRAULIC CIRCUIT AND ELECTRICAL CIRCUIT 8 MEMO ...
Страница 295: ...MAINTENANCE UNDER SPECIAL ENVIRONMENTAL CONDITIONS 9 MEMO ...
Страница 351: ...SPECIFICATIONS 12 42 MEMO ...
Страница 455: ...OPTIONAL ATTACHMENTS AND DEVICES 13 104 MEMO ...
Страница 460: ...INDEX 14 Working Ranges ZX280LC 3 280LCN 3 2 piece Boom 13 41 Working Ranges ZX350LC 3 350LCN 3 2 piece Boom 13 44 ...
Страница 461: ...INDEX 14 MEMO ...