MAINTENANCE
7-10
MAINTENANCE GUIDE
A. GREASING (See Page 7-16)
Parts
Quantity
Interval (hours)
8
50
100
250
500
1000
2000
1. Front Joint Pins
Bucket and Link Pins
9
★
★★
Others
11
★
★★
2. Swing Bearing
2
3. Swing Internal Gear
1
★★★
NOTE:
★
Maintenance required when operating in water or mud and under extremely severe condition.
★★
Maintenance required only during first time check.
★★★
Check and add grease.
IMPORTANT: Grease bucket and link pivots every day until break-in operation (50 hours) is complete. When the
bucket joint boss end faces are not finished with WC thermal spraying, grease the bucket two joint
pin sections at an interval of every 250 hours.
B. ENGINE (See Page 7-20)
Parts
Quantity
Interval (hours)
8
50
100
250
500
1000
2000
1. Engine Oil
Oil Level Check
1
2. Engine Oil
Change
ZX120-3, 180-3
Class
17.0 L
(4.5 US gal)
★
ZX200-3, 270-3
Class
23.0 L
(6.1 US gal)
★
ZX330-3 Class
41.0 L
(10.8 US gal)
★
3. Engine Oil Filter Replacement
1
★
NOTE:
★
Change 250 operating hours, if the content of sulfur of fuel is 2000 ppm or more.
Consult your nearest Hitachi dealer for the details.
Содержание ZAXIS 120-3 class
Страница 1: ......
Страница 3: ......
Страница 5: ......
Страница 49: ...SAFETY SIGNS Europe Asia Middle and Near East Model Only S 38 MEMO ...
Страница 131: ...BREAK IN 2 MEMO ...
Страница 191: ...TRANSPORTING 6 MEMO ...
Страница 290: ...HYDRAULIC CIRCUIT AND ELECTRICAL CIRCUIT 8 HYDRAULIC CIRCUIT M1V1 08 001 ...
Страница 292: ...8 ELECTRICAL DIAGRAM ...
Страница 293: ...HYDRAULIC CIRCUIT AND ELECTRICAL CIRCUIT 8 MEMO ...
Страница 295: ...MAINTENANCE UNDER SPECIAL ENVIRONMENTAL CONDITIONS 9 MEMO ...
Страница 351: ...SPECIFICATIONS 12 42 MEMO ...
Страница 455: ...OPTIONAL ATTACHMENTS AND DEVICES 13 104 MEMO ...
Страница 460: ...INDEX 14 Working Ranges ZX280LC 3 280LCN 3 2 piece Boom 13 41 Working Ranges ZX350LC 3 350LCN 3 2 piece Boom 13 44 ...
Страница 461: ...INDEX 14 MEMO ...