OPERATING THE MACHINE
5-8
WORK MODE
Five work modes can be selected for most appropriate hydrau-
lic circuit and pump flow rate for the front attachment.
When the engine is started, the digging mode is automatically
set. Each time work mode switch is pressed, the five following
modes are selected alternately.
• Digging Mode
• Breaker 1
• Breaker 2
• Pulverizer 1
• Crusher 1
The selected work mode is indicated by attachment mode
indicator (2) of basic screen (1). Select the work mode corre-
sponding to the work in which the machine is engaged while
referring to the table below.
Work Mode
Description
Digging Mode
Select this mode when using bucket or fork grapple.
Breaker 1 Mode
Select this mode when using breakers other than NPK breaker.
Breaker 2 Mode
Select this mode when using NPK breaker.
Pulverizer 1 Mode
Select this mode when using pulverizer.
Crusher 1 Mode
Select this mode when using crusher.
NOTE: Five work modes shown above are designated as the
standard specifications. Up to five attachment modes
other than the digging mode can be designated. Con-
sult your nearest Hitachi dealer for adding or changing
the designation of the attachment modes.
M1U1-01-004
1
2
Содержание ZAXIS 120-3 class
Страница 1: ......
Страница 3: ......
Страница 5: ......
Страница 49: ...SAFETY SIGNS Europe Asia Middle and Near East Model Only S 38 MEMO ...
Страница 131: ...BREAK IN 2 MEMO ...
Страница 191: ...TRANSPORTING 6 MEMO ...
Страница 290: ...HYDRAULIC CIRCUIT AND ELECTRICAL CIRCUIT 8 HYDRAULIC CIRCUIT M1V1 08 001 ...
Страница 292: ...8 ELECTRICAL DIAGRAM ...
Страница 293: ...HYDRAULIC CIRCUIT AND ELECTRICAL CIRCUIT 8 MEMO ...
Страница 295: ...MAINTENANCE UNDER SPECIAL ENVIRONMENTAL CONDITIONS 9 MEMO ...
Страница 351: ...SPECIFICATIONS 12 42 MEMO ...
Страница 455: ...OPTIONAL ATTACHMENTS AND DEVICES 13 104 MEMO ...
Страница 460: ...INDEX 14 Working Ranges ZX280LC 3 280LCN 3 2 piece Boom 13 41 Working Ranges ZX350LC 3 350LCN 3 2 piece Boom 13 44 ...
Страница 461: ...INDEX 14 MEMO ...