– 27 –
3. MAINTENANCE AT BEGINNING OF LONG OFF PERIOD
●
Run the unit by setting the operation mode to
(COOL), the temperature to 32°C and the fan speed
to HI for about half a day on a fine day, and dry the
whole of the unit.
●
Switch off the power plug.
1
2
3
REGULAR INSPECTION
PLEASE CHECK THE FOLLOWING POINTS BY QUALIFIED SERVICE PERSONAL EITHER
EVERY HALF YEARLY OR YEARLY. CONTACT YOUR SALES AGENT OR SERVICE SHOP.
Is the earth line disconnected or broken?
Is the mounting frame seriously affected by rust and is the
outdoor unit tilted or unstable?
Is the plug of power line firmly plugged into the socket?
(Please ensure no loose contact between them).
Air
Blow
Cleaning and maintenance must be carried out only by qualified service personal. Before cleaning,
stop operation and switch off the power supply.
!
CAUTION
Confirm
Содержание RAC-25CNH11
Страница 35: ... 35 CIRCUIT DIAGRAM MODEL RAS 25CNH11 ...
Страница 36: ... 37 CIRCUIT DIAGRAM MODEL RAC 25CNH11 ...
Страница 104: ... 113 PARTS LIST AND DIAGRAM MODEL RAS 25CNH11 11 2 18 8 20 19 12 63 1 4 60 3 7 14 15 6 5 16 13 88 61 17 9 62 10 ...
Страница 106: ... 115 MODEL RAC 25CNH11 55 22 59 16 26 24 23 20 21 19 13 52 58 53 56 57 2 3 51 15 14 18 4 5 9 6 8 54 17 7 11 10 12 25 ...
Страница 108: ...RAS 25CNH11 RAC 25CNH11 PM NO 0164E Printed in Malaysia HITACHI ...