
Figure 5-90 Installing the PCI card cage
Replacing a mezzanine card in the PCI expansion blade
This procedure describes how to remove a mezzanine card in the PCI
expansion blade.
Removing a mezzanine card
1
.
Put on an anti-static wrist strap.
2
.
Record the parameters in the case of replacing Emulex HBA card.
See
Configuration procedure for Emulex HBA card on page 7-2
section.
3
.
Remove the target PCI expansion blade.
Replacing parts
5-73
Hitachi Compute Blade 500 Series System Service Manual
Содержание CB 520A A1
Страница 26: ...xxvi Preface Hitachi Compute Blade 500 Series System Service Manual ...
Страница 152: ...4 64 Common process for replacement Hitachi Compute Blade 500 Series System Service Manual ...
Страница 294: ...6 12 Identifying RAID rebuild status Hitachi Compute Blade 500 Series System Service Manual ...
Страница 432: ...9 16 Updating firmware Hitachi Compute Blade 500 Series System Service Manual ...
Страница 439: ...Change LOM configuration 10 7 Hitachi Compute Blade 500 Series System Service Manual ...
Страница 442: ...10 10 Change LOM configuration Hitachi Compute Blade 500 Series System Service Manual ...
Страница 450: ...10 18 Change LOM configuration Hitachi Compute Blade 500 Series System Service Manual ...
Страница 464: ...11 14 Troubleshooting Hitachi Compute Blade 500 Series System Service Manual ...
Страница 465: ...Hitachi Compute Blade 500 Series System Service Manual ...