6
.
Ensure that the shutdown was completed and the Power LED blinks in
green.
Figure 4-50 Power off procedure of failed server blade
(A)-2 For SMP CB 520X B1/B2/B3
1
.
Ensure that Power LED lights in green.
2
.
Logon to the web console and select Resource.
3
.
Select Modules > All Modules > Server blades >Server Blade n of
the SMP configuration.
(Note: "n" indicates the slot number of the primary blade.)
4
.
Select Condition tab.
5
.
Click Power OFF.
6
.
Ensure that the shutdown was completed and the Power LED blinks in
green.
Common process for replacement
4-59
Hitachi Compute Blade 500 Series System Service Manual
Содержание CB 520A A1
Страница 26: ...xxvi Preface Hitachi Compute Blade 500 Series System Service Manual ...
Страница 152: ...4 64 Common process for replacement Hitachi Compute Blade 500 Series System Service Manual ...
Страница 294: ...6 12 Identifying RAID rebuild status Hitachi Compute Blade 500 Series System Service Manual ...
Страница 432: ...9 16 Updating firmware Hitachi Compute Blade 500 Series System Service Manual ...
Страница 439: ...Change LOM configuration 10 7 Hitachi Compute Blade 500 Series System Service Manual ...
Страница 442: ...10 10 Change LOM configuration Hitachi Compute Blade 500 Series System Service Manual ...
Страница 450: ...10 18 Change LOM configuration Hitachi Compute Blade 500 Series System Service Manual ...
Страница 464: ...11 14 Troubleshooting Hitachi Compute Blade 500 Series System Service Manual ...
Страница 465: ...Hitachi Compute Blade 500 Series System Service Manual ...