
Figure 5-63 Removing the connector cover
3
.
Align the three alignment holes of mezzanine card with the guide pins, as
shown below.
4
.
Reverse the removal procedure.
5
.
Configure the parameters in the case of replacing Emulex HBA card.
See
Configuration procedure for Emulex HBA card on page 7-2
6
.
Perform
Installing a half-wide server blade on page 5-5
Figure 5-64 Installing the mezzanine card
Notice:
Restriction; The half wide server blade with LOM cannot install the
mezzanine card at the slot number 1 because the LOM pass through
connector is already mounted in the server blade that supported the LOM.
The LOM pass through connector is not a replaceable component.
5-50
Replacing parts
Hitachi Compute Blade 500 Series System Service Manual
Содержание CB 520A A1
Страница 26: ...xxvi Preface Hitachi Compute Blade 500 Series System Service Manual ...
Страница 152: ...4 64 Common process for replacement Hitachi Compute Blade 500 Series System Service Manual ...
Страница 294: ...6 12 Identifying RAID rebuild status Hitachi Compute Blade 500 Series System Service Manual ...
Страница 432: ...9 16 Updating firmware Hitachi Compute Blade 500 Series System Service Manual ...
Страница 439: ...Change LOM configuration 10 7 Hitachi Compute Blade 500 Series System Service Manual ...
Страница 442: ...10 10 Change LOM configuration Hitachi Compute Blade 500 Series System Service Manual ...
Страница 450: ...10 18 Change LOM configuration Hitachi Compute Blade 500 Series System Service Manual ...
Страница 464: ...11 14 Troubleshooting Hitachi Compute Blade 500 Series System Service Manual ...
Страница 465: ...Hitachi Compute Blade 500 Series System Service Manual ...