CHASSIS
- 300-
Oil Cooling System
INSTALLING OIL COOLING SYSTEM
1. To take a pressure resistance inspection to the
Oil Cooling System after maintain, the
pressure is 0.3MPA.
2. After take the pressure resistance inspection,
pass over 0.03MPA compressed air through
the connecting oil cooler, steel oil pipe and
Rubber Pipe for 3 minutes, do not leak.
3. According to the disassembly order, reverse
carries on the assembly.
4. When it is assemblied, pour the" L" engine oil,
then start the engine for 10 minutes to check
whether leaks. If it is not ,the Oil Cooling
System maintain is finish.
Содержание HS700UTV-4
Страница 95: ...SPECIFICATIONS 82 HYDROGRAPHIC CHART Hydrographic chart Pressure splash...
Страница 96: ...SPECIFICATIONS 83 LUBRICATION OIL WAY Hydrographic chart Pressure splashing oil...
Страница 149: ...ENGINE 136 No Part Name Qty Remarks 13 Thermo switch 1 1 For installation reverse the removal procedure...
Страница 242: ...CHASSIS 229 No Part Name Qty Remarks 25 Dust seal 1 26 Caliper piston seal 1 27 Bleed screw 1...
Страница 291: ...CHASSIS 278 No Part Name Qty Remarks 12 Spring washer 8 4 13 Washer 8 16 1 6 2 14 Washer 10 20 2 2...
Страница 293: ...CHASSIS 280 No Part Name Qty Remarks 11 Cross large plate head screw M6 16 4 12 Nut clip M6 4...
Страница 380: ......
Страница 381: ......
Страница 382: ......
Страница 383: ......
Страница 384: ......
Страница 385: ......
Страница 386: ......
Страница 387: ......
Страница 388: ......