Filling the
weight box:
9. Completely fill the weight box with the
counterweights. Stack the counterweights
flatly, one on top of the other, 6 x 16 kg on
each side of the weight box.
WARNING:
Only use lift specific counterweights!
GML/K
Transport position:
1. Maintain a firm grip on the outrigger before
you proceed with step 2! The outrigger may
fall unexpectedly.
Always lower the outriggers individually and
one side after the other.
2. Remove the socket pin (a) completely from
the chassis.
Securing
the
outrigger:
4. Place the socket pin in the upper rear slot
(c) in order to re-connect the outrigger to
the chassis.
5. Repeat steps 1 to 4 for the outrigger on the
opposite side.
Lowering
the
outrigger:
3. Lower the outrigger carefully until the
wheels are in full contact with the floor
surface.
Please note:
The front fixing pin on the chassis (b) works
as an axle when lowering the outrigger.
The outrigger cannot be removed.
Installation GML/K
Converting the lift from transport position to operating position.
Set up the lift on firm and level ground only.
Ensure that all caster safety brakes on the chassis are engaged during set up.
Glass and Material Lift
GML 800+
Installing the
steering arm:
10. Disengage the spring bolts (e) on the
socket pins (f) at the rear end of both
outriggers and completely remove the
spring bolts. Keep both spring bolts within
easy reach.
11. Place the steering arm (4) on both socket
pins (f) and resecure it with the previously
removed spring bolts (e).
Installing the
weight box:
6. Remove both socket pins (2) from the
receptor pins for the weight box (d) by
releasing the safety ring.
7. Position the weight box (1) on the receptors
on both outriggers (d).
8. Secure the weight box with the socket pins
(2) on both sides and reactivate the safety
ring on the locking bolts.
b)
1)
2)
4)
3)
Components:
1) 1x Weight box
2) 2x Safety bolt boxes
3) 12 x 16kg Weights
4) 1x Steering arm
5) Steering arm spring bolts
2)
d)
1)
a)
4)
f)
e)
e)
f)
c)
b)
WARNING:
1. NEVER operate the GML/K unless the weight box is completely filled!
2. Never operate the lift with only one outrigger!
3. Both outriggers must be pointing in the same direction! Otherwise the lift must not be operated!
4. Never move the lift with a raised load! Only allow for minor position changes.
5. Avoid sudden movements.