![hilscher netTAP NT 50 Series Скачать руководство пользователя страница 69](http://html1.mh-extra.com/html/hilscher/nettap-nt-50-series/nettap-nt-50-series_user-manual_2134827069.webp)
Wiring Instructions
69/86
netTAP NT 50 | Gateway Devices
DOC091202UM09EN | Revision 9 | English | 2013-02 | Released | Public
© Hilscher, 2010-2013
10.1 Assembly of D-Sub Connectors
The design of the bus cabling is an essential factor for the proper function
of communication. Therefore, special attention should be paid to the cable
connections with its connectors. Particularly, ensure good shield connec-
tion.
The shield must be connected as follows
1. Dismantle the cable.
2. Pull back the shielding from the cable sheathing.
3. Reduce the shielding that later it is covered by the nozzle.
4. Push a nozzle or shrinking tube over the cable sheathing that at the
cable end a zone of 5 to 8 mm remains free.
5. Connect the wire ends with the connector
6. Then push the cable in the plug to the bare braided shield under the
strain relief.
7. Fix the strain relief with screws.
The cable connection should look like shown below:
Figure 11: D-Sub Cable Assemblies
Fixing screw UNC.
Metallic plug collar
Strain relief for connecting the shielding with the connector housing
Shrinking tube or nozzle to cover the shielding and for bend protec-
tion
Cable shielding pulled back over the cable sheathing
Metallic or metallized connector housing