![Hills Reliance 12 Скачать руководство пользователя страница 64](http://html.mh-extra.com/html/hills/reliance-12/reliance-12_installation-and-programming-manual_2134389064.webp)
© Hills Industries 2006
Page 62
Installation Floor Plan
Instructions
1. Sketch the layout of the building using the grid to scale dimensions
2. Identify the position of the control panel, sirens and code pads
3. Identify the location of all detectors and verify device coverage with device specifications
4. Plan models and quantities of hardware on the table below
Installation Parts List
Device
Model / Quantity
Device
Model / Quantity
Control Panel
Code Pads (LED)
Siren (Internal)
Code Pads (LCD)
Siren (External)
Code Pads (Icon)
Strobe
7 Relay Module
PIRs
8 Output Module
Reed switches
16 Zone Expander
Detector cable
Smoke Alarms
Data cable
Wireless Receiver
Battery
Key
Fobs
Power Supply
Smart Power Supply