Once case is prepared per prior step, it can be moved thru
80” door way by lifting through the base feet. *WARINING:
If lifted through base feet, blades must be fully past the
second set of base feet. Attach ratchet strap from case top
anchor point to lifting equipment. Case to be hovered with-
in ¼” from ground level . Installer responsible to comply
with all OSHA, local, and customer safety requirements.
Installer responsible to provide equipment ad-equately
sized for the task.*
10.
Hydraulic pallet-rack jacks, or other manual methods may
be used, provided care is taken to protect the case, and
designated lift points are used.
Lift through base feet.
Clear second set of base feet.
Connect rachet strap from the top to the bottom.
Hydraulic Jack
Protect case and use designated lift points.
Содержание JNRBHSA
Страница 2: ...ii ...
Страница 33: ...B2 SEISMIC BRACKETS 5 BRACKETS ...
Страница 34: ...C1 SPORLAN PRESSURE TEMPERATURE CHART ...
Страница 38: ...Display Cases 5XIILQ 0LOO 5RDG RORQLDO HLJKWV 9 E3 ELECTRICAL WIRING DIAGRAM ...
Страница 39: ...Display Cases 5XIILQ 0LOO 5RDG RORQLDO HLJKWV 9 E4 ELECTRICAL WIRING DIAGRAM ...
Страница 46: ...G1 FASCIA FRAME ...
Страница 47: ...G2 FASCIA FRAME ...
Страница 48: ...G3 FASCIA FRAME ...
Страница 49: ...G4 FASCIA FRAME ...
Страница 50: ...G5 FASCIA FRAME OPTIONAL MOTION SENSOR INSTALLATION ...
Страница 51: ...G6 FASCIA FRAME OPTIONAL MOTION SENSOR INSTALLATION ...
Страница 53: ...G8 FASCIA FRAME JNRZHSA 5 BALLOON GUARD INSTALLATION ...
Страница 55: ...I1 CASE LIFTING LOCATIONS Base Frame Lifting Locations for Forklift JNRBHSA JNRZHSA ...
Страница 56: ...I2 CASE LIFTING LOCATIONS Base Frame Lifting Locations for Forklift JNRBHSA JNRZHSA ...
Страница 57: ...v Ϯ Z Ͳ ϱ Z EZ v Ϯ Z Ͳ ϰ Z EZ v ϱ EZ J1 CONDENSING UNIT LOCATIONS ...