Fig. 2 Align to fascia stops at case ends.
Fig. 1 Install recessed coil shroud.
Fig. 4 Secure the front fascia to the case
body.
Fig. 5 Move electrical box forward and con-
nect heater wire.
Fig. 7 Install heater wire cover.
Fig. 6 Secure electrical box to case body.
Fig. 3 Attach the front fascia to the re-
cessed coil shroud.
Fig. 8 Attach end panel to front fascia.
Fig. 9 Attach end panel to case body.
D1: CASE TOP FASCIA
ATTN: FOR CASE TOP FASCIA WITH CUSTOMER SPECIFIC SIGNAGE SEE APPENDIX F
Install the recessed coil shroud (Fig. 1), leaving about an inch of clearance on both sides of the coil.
Align the ends of the front fascia to the fascia stops at each end of the case (Fig. 2). Attach the front fascia to the recessed
coil shroud baf
fl
e (Fig. 3) using the pre-punched screw holes. Then secure the bottom edge the front fascia to the
case body using the pre-punched screw holes (Fig. 4).
Move the electrical junction box forward so that the Carel controller display and GFI are aligned with the pre-punched
cutouts (Fig. 5). Pull the heater wire through the cutout in the fascia and connect to the cornice mounted harness. Then
secure the electrical box to the case body using #8 tek screws (Fig. 6). Cover the heater wiring with the metal cover (Fig.
7) and secure using the pre-punched screw holes.
If present, attach the two-part, adjustable end panels (Fig. 8) to the front fascia using pre-punched screw holes. Then
secure end panels to the case body (Fig. 9). Install any fascia joint trim that ships with multi-case line-ups.
Содержание JNRBHSA
Страница 2: ...ii ...
Страница 33: ...B2 SEISMIC BRACKETS 5 BRACKETS ...
Страница 34: ...C1 SPORLAN PRESSURE TEMPERATURE CHART ...
Страница 38: ...Display Cases 5XIILQ 0LOO 5RDG RORQLDO HLJKWV 9 E3 ELECTRICAL WIRING DIAGRAM ...
Страница 39: ...Display Cases 5XIILQ 0LOO 5RDG RORQLDO HLJKWV 9 E4 ELECTRICAL WIRING DIAGRAM ...
Страница 46: ...G1 FASCIA FRAME ...
Страница 47: ...G2 FASCIA FRAME ...
Страница 48: ...G3 FASCIA FRAME ...
Страница 49: ...G4 FASCIA FRAME ...
Страница 50: ...G5 FASCIA FRAME OPTIONAL MOTION SENSOR INSTALLATION ...
Страница 51: ...G6 FASCIA FRAME OPTIONAL MOTION SENSOR INSTALLATION ...
Страница 53: ...G8 FASCIA FRAME JNRZHSA 5 BALLOON GUARD INSTALLATION ...
Страница 55: ...I1 CASE LIFTING LOCATIONS Base Frame Lifting Locations for Forklift JNRBHSA JNRZHSA ...
Страница 56: ...I2 CASE LIFTING LOCATIONS Base Frame Lifting Locations for Forklift JNRBHSA JNRZHSA ...
Страница 57: ...v Ϯ Z Ͳ ϱ Z EZ v Ϯ Z Ͳ ϰ Z EZ v ϱ EZ J1 CONDENSING UNIT LOCATIONS ...