8
CASE INSTALLATION
5.
Once all screws are removed, (two 3/8 Hex screws located
next to the large arrows in the photo above) the skid rails
and caster assemblies will drop away from the case.
6.
Copper lines at top rear are held to case by clamps –
remove clamps and
fl
ex copper lines down and to rear of
case if required to pass through the store doorway. The
screws have ¼” hex head.
7.
The case wiring exits into a permanent enclosure at top
left rear of case. Flexible conduit is provided from this
enclosure to the case controller box. Remove screws (1/4”
hex head) and reposition controller box if required to pass
underneath the store doorway.
8.
Shipping braces are attached to the open end of cases
with 2 bolts. Remove the braces (9/16” hex head) if re-
quired to pass underneath the store door way.
Содержание JNRBHSA
Страница 2: ...ii ...
Страница 33: ...B2 SEISMIC BRACKETS 5 BRACKETS ...
Страница 34: ...C1 SPORLAN PRESSURE TEMPERATURE CHART ...
Страница 38: ...Display Cases 5XIILQ 0LOO 5RDG RORQLDO HLJKWV 9 E3 ELECTRICAL WIRING DIAGRAM ...
Страница 39: ...Display Cases 5XIILQ 0LOO 5RDG RORQLDO HLJKWV 9 E4 ELECTRICAL WIRING DIAGRAM ...
Страница 46: ...G1 FASCIA FRAME ...
Страница 47: ...G2 FASCIA FRAME ...
Страница 48: ...G3 FASCIA FRAME ...
Страница 49: ...G4 FASCIA FRAME ...
Страница 50: ...G5 FASCIA FRAME OPTIONAL MOTION SENSOR INSTALLATION ...
Страница 51: ...G6 FASCIA FRAME OPTIONAL MOTION SENSOR INSTALLATION ...
Страница 53: ...G8 FASCIA FRAME JNRZHSA 5 BALLOON GUARD INSTALLATION ...
Страница 55: ...I1 CASE LIFTING LOCATIONS Base Frame Lifting Locations for Forklift JNRBHSA JNRZHSA ...
Страница 56: ...I2 CASE LIFTING LOCATIONS Base Frame Lifting Locations for Forklift JNRBHSA JNRZHSA ...
Страница 57: ...v Ϯ Z Ͳ ϱ Z EZ v Ϯ Z Ͳ ϰ Z EZ v ϱ EZ J1 CONDENSING UNIT LOCATIONS ...