10
CASE INSTALLATION
11.
Remove 3.25” riser feet from inside of the case (the ris-
ers are shipped loose so the case can deliver through short
doorways). Lift the case at designated areas. If using pal-
let jack, avoid damaging the drain hub (centered left-right
on case). Slide 1 riser under each 1 permanent base foot.
Tabs at rear will nest into foot – align pre-punched holes
on front vertical
fl
ange and secure with provided #8 TEK
screws (two places per riser). Once risers are secured, the
case can be shimmed beneath the risers.
Lift case in designated areas.
Avoid the drain hub when using pallet jack.
3.25” Riser
Align pre-punched holes.
#8 TEK screws (2 per riser).
Risers secured.
Case shimmed beneath risers.
Содержание JNRBHSA
Страница 2: ...ii ...
Страница 33: ...B2 SEISMIC BRACKETS 5 BRACKETS ...
Страница 34: ...C1 SPORLAN PRESSURE TEMPERATURE CHART ...
Страница 38: ...Display Cases 5XIILQ 0LOO 5RDG RORQLDO HLJKWV 9 E3 ELECTRICAL WIRING DIAGRAM ...
Страница 39: ...Display Cases 5XIILQ 0LOO 5RDG RORQLDO HLJKWV 9 E4 ELECTRICAL WIRING DIAGRAM ...
Страница 46: ...G1 FASCIA FRAME ...
Страница 47: ...G2 FASCIA FRAME ...
Страница 48: ...G3 FASCIA FRAME ...
Страница 49: ...G4 FASCIA FRAME ...
Страница 50: ...G5 FASCIA FRAME OPTIONAL MOTION SENSOR INSTALLATION ...
Страница 51: ...G6 FASCIA FRAME OPTIONAL MOTION SENSOR INSTALLATION ...
Страница 53: ...G8 FASCIA FRAME JNRZHSA 5 BALLOON GUARD INSTALLATION ...
Страница 55: ...I1 CASE LIFTING LOCATIONS Base Frame Lifting Locations for Forklift JNRBHSA JNRZHSA ...
Страница 56: ...I2 CASE LIFTING LOCATIONS Base Frame Lifting Locations for Forklift JNRBHSA JNRZHSA ...
Страница 57: ...v Ϯ Z Ͳ ϱ Z EZ v Ϯ Z Ͳ ϰ Z EZ v ϱ EZ J1 CONDENSING UNIT LOCATIONS ...